论文部分内容阅读
目前,在一般大容量转炉炼钢厂中,已能在双流板坯连铸机或多流方坯连铸机上进行浇注,但是转炉和浇铸周期常常不相配合。要实现在多炉连浇和在单炉浇铸时每次由转炉送来的第二炉钢水均在同一台连铸机上浇铸的目的,则在多种断面和产品纲领条件下,为保持浇铸车间不受干扰,必须对一座吹炼炉设置三台连铸机。而且作为多炉连铸应理解为多炉钢水不停歇的浇铸,因此在这多炉浇铸之间铸机不检修。直接供线材轧机用的小坯的专用连铸,以需要的角度出发,最近或更早些时候在小
Currently, in a typical large-capacity converter steelworks, casting can be done on a dual-strand slab caster or a multi-strand billet caster, but the converter and casting cycles often do not fit. In order to achieve the purpose of continuous casting of multiple furnaces and the second furnace molten steel sent from the converter in the single furnace casting all on the same continuous casting machine, under the conditions of various sections and product programs, in order to keep the casting workshop Uninterrupted, three continuous casting machines must be set up for a furnace. And as a multi-furnace continuous casting should be understood as a multi-furnace molten steel non-stop casting, casting machines in this multi-furnace machine does not overhaul. Direct for the wire rod mill with a small billet dedicated continuous casting, the necessary point of departure, recently or earlier in the small