论文部分内容阅读
通过广州市地铁三号线某泥水盾构工程过桩基础施工的成功经验,介绍泥水盾构遇到桩基础时的施工措施。
Through the successful experience of the construction of a mud-water shield project in Guangzhou Metro Line 3, this paper introduces the construction measures when the mud-water shield meets the pile foundation.