在目前经济下行背景下,工程垫资是承接工程的重大风险,垫资工程接还是不接呢?如何评估、预防和控制垫资风险呢?减少垫资收不回来的金额和概率的办法就是要求发包人为承包人垫资回收提供足够的担保。如何要求发包人提供担保呢?要求发包人按照新版施工合同示范文本规定提供银行支付保函?这往往没有操作性,否则银行直接贷款给发包人就行了。发包人的股权、土地和待建房屋,都是很好的担保方式。承包人可以以委托贷款方式垫资,要求发包人抵押土地担保;也可以同时和发包人签订商
In the current economic downturn, it is a significant risk that undertaking construction projects will be undertaken to undertake construction projects. How can we evaluate, prevent and control the risk of capital investment? The way to reduce the amount and probability of non-recurring losses is Require the contractor to provide sufficient guarantee for the contractor to reclaim the fund. How to ask the employer to provide the guarantee? Ask the employer to provide the bank to pay the guarantee letter in accordance with the new version of the construction contract model text? This is often not operable, or the bank loans the contractor directly. Employer’s equity, land and buildings to be built are good ways to guarantee. The contractor can borrow funds entrusted loans, requiring the contractor mortgage land guarantee; also signed with the contractor at the same time