我国的大型高炉配备大型轴流式风机以后,生产得到进一步强化,本钢2000米~3 5号高炉在1977年10月综合冶炼强度曾达0.95吨/米~3,炉容利用系数为1.77吨/米~3,随着钢铁生产的发展,大型高炉将发挥越来越大的作用。但是,在大型高炉强化过程中,操作上遇到一个问题——巨型管道行程,这种管道行程的特点是来的突然,反映剧烈,处理棘手,后果严重。 5号高炉于去年底和今年初,发生了三次巨型管道行程,第一次处理24小时,炉况方恢复正常,损失生铁两千余吨,焦炭四百吨,出号外铁一千吨。第三次造成了炉缸冻结,经过艰苦的历时五天的抢救,
China’s large blast furnace equipped with large-scale axial flow fan, the production has been further strengthened, Benxi Iron and Steel 2000-350 blast furnace in October 1977 comprehensive smelting strength had reached 0.95 tons / m ~ 3, the furnace capacity utilization factor of 1.77 tons / M ~ 3, with the development of steel production, large blast furnace will play an increasingly important role. However, one of the operational problems encountered during the fortification of large blast furnaces is the huge pipeline journey which is characterized by sudden, dramatic, tricky and serious consequences. At the end of last year and the beginning of this year, No.5 blast furnace occurred three huge pipeline trips. The first treatment took 24 hours and the furnace condition returned to normal with loss of more than 2,000 tons of pig iron, 400 tons of coke and 1000 tons of iron. The third caused the hearth frozen, after a painstaking five-day rescue,