论文部分内容阅读
1989年初,江苏省冶金设计院根据江苏省带钢轧机的现状,在广泛调查的基础上,积极开发研制WC-350轧机新技术。省冶金厅把研制WC轧机新技术列为省“八五”科研项目。经过考察,省冶金设计院选择在常熟冷轧带钢总厂的轧机上进行技术改造,并和常熟市新型钢材研究所合作,经过半年多的努力,研制成功了WC-350轧机新技术,最近通过了省级技术鉴定。
In early 1989, Jiangsu Metallurgical Design Institute based on the status of strip rolling mill in Jiangsu Province, on the basis of extensive investigation, and actively develop new technology WC-350 rolling mill. Provincial Metallurgical Hall to develop new technologies WC rolling mill as provincial “Eighth Five-Year” research projects. After investigation, the provincial Metallurgical Design Institute chose to Changshu Cold-Rolling Mill Plant on the technical transformation and Changshu City, and the new steel Institute, after more than six months of hard work to develop a successful WC-350 rolling mill technology, the recent Passed the provincial technical appraisal.