论文部分内容阅读
随着国家对电网改造资金的投入,各地均抓住机遇,对电网正进行着高标准的建设和改造。笔者在参与农网改造和建设中深感有几点值得注意之处,供同行们参考。1变电所部分(1)主变压器的选择宜采用两台不同容量的变压器,并考虑要满足并列运行的条件,根据负荷情况,随时...
With the state investment in power grid reconstruction funds, all localities seize the opportunity to carry out a high standard of power grid construction and transformation. I am involved in the reform and construction of rural power grid there are several points worth noting, for colleagues for reference. 1 substation part (1) the choice of the main transformer should adopt two different capacity transformers, and consider to meet the conditions of parallel operation, according to the load situation, at any time ...