(一)抓好工艺工作是稳定和提高电站设备成套行业产品质量的一项刻不容缓的战略任务为提高发电设备设计、制造技术水平,我公司所属各厂分别引进美国西屋公司和燃烧工程公司的30万和60万千瓦火电机组以及引进输配电方面的技术。经过几年来的努力,第一台30万千瓦引进机组已于87年6月在山东石横电厂投运发电。同时,我公司下属各厂也注意引进了一些先进工艺和工艺装备,使上海电站设备在“七五”期间的发展有一个较好的基础。但工艺管理和工艺水平与国内外同行业相比较,还存在很大差距,主要是工艺管理水平落后,工艺装备老化严重。由此可见,当前强化工艺管理,严格工艺纪律,提高工艺水平已成为稳定、提高产品质量的一项刻不容缓的任务。随着“工艺突破口”工作的深入开展,我
(I) Grasping workmanship is a momentous strategic task for stabilizing and improving product quality in the power plant equipment industry. To improve the technical level of power plant design and manufacturing, our company’s affiliated factories are respectively imported into the US Westinghouse and Combustion Engineering Company. Million and 600,000 kilowatts of thermal power units and the introduction of transmission and distribution technologies. After several years of efforts, the first 300,000-kilowatt imported unit was put into operation in June of 2007 in Shandong Shiheng Power Plant. At the same time, the subsidiaries of our company have also paid attention to the introduction of advanced technology and equipment, so that the development of Shanghai power station equipment has a good foundation during the “7th Five-Year Plan” period. However, compared with the same industry at home and abroad, there is still a big gap between process management and technology level, mainly due to the backwardness of process management and severe aging of process equipment. It can be seen that the current strengthening of process management, strict process discipline, and improvement of process levels have become an urgent task to stabilize and improve product quality. With the in-depth development of the “process breakthrough”, I