为适应全国基本建设管理体制改革的形势发展,发挥设计在工程建设中的主导作用,我们根据国家计委的安排,建立了以设计为主体的包括设计、施工、资金、工程进度、设备采购宜到试车考核的总承包试点,即以兖州煤矿设计研究院为依托的兖州设计工程公司.公司是1987年6月成立,目前共有20人,其中高级工程师5人,工程师、会计师6人,助理工程师4人,外聘老工长1人和设备科长2人.公司成立后,主要承包了总投资6895万元、年入洗原煤能力300万t的鲍店煤并选煤厂和枣庄矿务局的孙岗交接站(总投资900多万元)及尹洼集配站(总投资700万元)工程.一年多试点实践表明,在工程建设中抓住设计这个关键环节是非常正确的,进行以设计为主体的工程总承包是及时的、有益的.主要经验和问题如下:
In order to meet the development of the reform of the national capital construction management system and give full play to the leading role of design in project construction, according to the arrangement of the State Development Planning Commission, we have set up a system that takes design as the main part, including design, construction, capital, project progress, To test the general contract pilot test, that is, Yanzhou coal mine design and Research Institute as the basis of the Yanzhou Design Engineering Company. The company was established in June 1987, a total of 20 people, including five senior engineers, engineers, accountants 6, Assistant Engineer 4 people, an external staff 1 and equipment chief 2. After the founding of the company, the main contractor with a total investment of 68.95 million yuan, the annual import capacity of 3 million tons of coal bao coal and coal preparation plant and Zaozhuang Mining Bureau of Sun Gang transfer station (with a total investment of more than 900 million) and Yin depression set with the station (a total investment of 7 million yuan) project more than a year of pilot practice shows that in the construction of the project to seize this key link is very correct, It is timely and beneficial to carry out design-based EPC projects. The main experiences and questions are as follows: