摘要:随着我国城市建设的发展,市政道路给排水工程的管理也越来越科学,施工质量也越来越高。与此同时,给排水工程的施工技术也迅速提高并日趋完善。市政道路给排水工程,对于城市经济建设和人民日常生活都有重要影响,它直接关系到一个城市的整体规划是否科学,也直接影响着一个城市整体功能能否正常发挥。因此,对于市政道路给排水工程,无论从规划上、管理上、还是施工技术上,我们都应该力求做到尽善尽美。
关键词:市政道路;给排水;施工技术要点
Abstract: along with the development of city construction, municipal water supply and drainage engineering management also way more and more scientific, construction quality more and more is also high. At the same time, water supply and drainage engineering construction technology also rapidly increased and improvement. Municipal road drainage engineering, for the city of economic development and People's Daily life has important influence, and it relates directly to a city if the overall planning of science, has a direct impact on a city can play a whole function normal. So, for municipal road drainage engineering, no matter from planning, management, or construction technology, we should all strive to do the best.
Keywords: municipal road; Water supply and drainage; Construction techniques
中图分类号:TU74文献标识码:A 文章编号:
随着我国城市化进程的加快,城市人口的数量急剧增多。在这种情况下,对于市政道路给排水工程的建设速度、质量和管理等都提出了新的要求。要想促进市政道路给排水系统建设的发展速度,满足城市日益增多的给水和排水需求,迅速提高施工技术是必要前提和基本保证。笔者根据自身多年工作和学习经验,对于市政道路给排水施工过程中一些技术要点做了简单的归纳和总结,在此与同行交流分享。
一、关于开挖坑槽的技术要点
开挖坑槽的过程,因为其所含技术含量并不高,体力劳动成分居多而通常不能引起人们的足够重视。然而,坑槽开挖的位置、深度、流程等,对整个工程质量、施工进度和使用效率等都有深远影响。应该引起我们的足够重视。在开挖坑槽的过程中,应注意以下几点:
1.在开挖前,要对地下已有管道、电缆以及其他建筑物的具体位置熟悉掌握,以便能在保护好公共设施,建筑等的前提下,保证工程顺利进行。
2.在雨季,要根据天气情况做预案,防止雨水对于基坑的破坏。
3.沟槽开挖工程接近尾声时,应将管道的基础准备做好,避免沟底的土壤长期暴露在外。
二、检查井施工方面的技术要点
检查井施工方面,应该注意以下问题:
1.无论是混凝土管道,还是金属类无压管道,只要其外壁与砌筑井壁洞圈之间为钢性连接,就要确保水泥砂浆应座浆饱满、密实。
2.对于金属类压力管道,井壁洞圈处应预设套管,并确保管道外壁与套管的间隙均匀,并采用柔性材料将间隙填嵌密实。
3.对于化学建材管道,应采用中介层法与井壁洞圈连接。4.在排水管道介入检查井时,要保持关口外缘与井内壁平齐。
三、关于管道方面的技术要点
(一)过街管安装的技术要点
1.要控制好管头插入检查井的长度,要保持和檢查井内壁持平,过长或过短都不行。同时采用砂浆与水泥配比二比一的泥砂浆抹平抹严。
2.与沉泥井相连一端的管子不宜过短,否则容易造成与沉泥井连接不上,需要重新接管。
3.安装过程中注意排水方向,防止出现倒坡现象。
4.管道内不能有泥土、砂浆、木块等杂物存在,管座混凝土需捣实,且与管壁紧密结合。
(二)顶管施工技术要点
顶管施工技术,是市政道路给排水工程中应用非常广泛的技术,通常在穿越公路、建筑、深埋等复杂的施工条件下适用。在顶管施工中,有以下技术要点需要注意:
1.对顶管工作井穿墙洞口前方进行灌浆止水工作时,洞口搅拌范围要控制在四米乘四米处。否则,可能造成工具头无法顺利出洞
2.顶进施工过程中,要控制好工具头的顶进速度,防止造成路面塌方。
3.整个顶进过程中要注意始终保持压浆,坚决杜绝在不压浆的情况下就顶进。
4.顶进过程要随时注意测量与纠偏。校正顶进方位,防止实际顶进线路与设计线路产生偏差。在顶进第一节管节时,每二十至五十米测量一次;而后的顶进过程中,每一米测量一次。以保证方向准确。在顶进过程中,要随时纠正工具头的方向。当工具头方向偏差超过五毫米,就应该调整纠偏千斤顶,控制顶进方向。
5.在第一节管顶进工作完成后,第二节管顶进工作开始前,要将千斤顶回缩并将水、电等拆开,然后再将千斤顶吊入下一节管段,调整位置,安装好管材接头止水材料,接通管线……对每一节管的操作都如此循环往复,切不可省略这些步骤,直接进入下一管段的顶进工作中。
6.顶管出洞口时,要对顶管机出洞口及周围的土体进行加固,起到挡土、阻水的作用,从而保证顶管机出洞安全。与此同时,要在工作井安装洞口止水设备,防止顶管机进出过程中的泥水流失。
四、管道测试方面的技术要点
在管道施工完成后,采用闭水法对管道进行检验以确保其严密性,是十分必要的环节。这能使我们及时发现和解决管道施工中的问题,避免留下安全和质量隐患,保证整个工程充分、稳定地发挥其使用功能。
在进行闭水法检查时,要注意以下几点:
1.对所有预留孔洞进行检查,确保全部预留孔洞都已经封堵完好。
2.彻底清理管道沟槽内的积水。
3.要确保管道两端的堵板有足够的承受力,要能承受闭水法实验的水压力。
4.在满水浸泡大于等于二十四小时后,从规定时间开始,全程观测管道的渗水量。观测时间不得少于半小时。
5.实验流程最好从上游向下游分段检查,以便节约水源。
五、回填方面的技术要点
井框与坑槽壁需要及时回填。回填材料可以选用在挖雨水井时,挖出来的三灰碎石、二灰土和素土,在回填过程中要注意分层夯实。在回填中要注意以下问题:
1.回填前如果发现沟槽中积水,要将积水清理后再进行回填。回填过程中也要防止雨水浸泡。
2.开槽时超挖的部分,回填时要用灌浆碎石填补,切记不可用素土。
3.安装雨水井与沉泥井的连接管时,要保证水流方向从雨水井平槽注入沉泥中,防止出现倒坡。
4.井盖由于灰口厚度掌握不准或者测量出差,会与边石不保持水平,如果高于边石,可以通过把井框边缘的混凝土砸掉一层来找平;反之,可以通过加大灰口来解决。
5.隔开雨水井和沉泥井的边石过厚,会导致两者间的间接管稍短。此时,可以将过街管砸断来代替。
结束语:市政道路给排水工程,是与城市发展、百姓生活、防汛抗涝等诸多方面都息息相关的工程项目。提高市政道路给排水工程的质量,能够从很大程度上促进城市现代化的进程和提高人民的生活水平。而提高质量的最主要也是最根本的途径,是在施工过程中注重先进技术的发明和应用。笔者希望通过对于市政道路给排水工程的施工技术方面的一些拙见,抛砖引玉,引起更多同行和有关部门对于市政道路给排水工程的关注,大家相互交流,共同进步,从而促进城市建设的发展。
参考文献:
[1]朱穗斌.市政给排水工程施工管理要点分析[J].科技信息(科学教研),2007(10).
[2]吴丽娟.城市污水管道顶管施工工艺及问题[J].科技资讯,2009(8).
[3]张闽.浅议市政给排水工程施工中质量的影响因素和项目质量控制[J].沿海企业与科技,2007,12.
[4]张小军.HDPE管在市政给排水工程应用中的几个问题[J].建材技术与应用,2007(7).
[5]张国荣,关英强,梁永田.给排水工程的非开挖拉管施工技术[J].中国新技术新产品,2010(22).
关键词:市政道路;给排水;施工技术要点
Abstract: along with the development of city construction, municipal water supply and drainage engineering management also way more and more scientific, construction quality more and more is also high. At the same time, water supply and drainage engineering construction technology also rapidly increased and improvement. Municipal road drainage engineering, for the city of economic development and People's Daily life has important influence, and it relates directly to a city if the overall planning of science, has a direct impact on a city can play a whole function normal. So, for municipal road drainage engineering, no matter from planning, management, or construction technology, we should all strive to do the best.
Keywords: municipal road; Water supply and drainage; Construction techniques
中图分类号:TU74文献标识码:A 文章编号:
随着我国城市化进程的加快,城市人口的数量急剧增多。在这种情况下,对于市政道路给排水工程的建设速度、质量和管理等都提出了新的要求。要想促进市政道路给排水系统建设的发展速度,满足城市日益增多的给水和排水需求,迅速提高施工技术是必要前提和基本保证。笔者根据自身多年工作和学习经验,对于市政道路给排水施工过程中一些技术要点做了简单的归纳和总结,在此与同行交流分享。
一、关于开挖坑槽的技术要点
开挖坑槽的过程,因为其所含技术含量并不高,体力劳动成分居多而通常不能引起人们的足够重视。然而,坑槽开挖的位置、深度、流程等,对整个工程质量、施工进度和使用效率等都有深远影响。应该引起我们的足够重视。在开挖坑槽的过程中,应注意以下几点:
1.在开挖前,要对地下已有管道、电缆以及其他建筑物的具体位置熟悉掌握,以便能在保护好公共设施,建筑等的前提下,保证工程顺利进行。
2.在雨季,要根据天气情况做预案,防止雨水对于基坑的破坏。
3.沟槽开挖工程接近尾声时,应将管道的基础准备做好,避免沟底的土壤长期暴露在外。
二、检查井施工方面的技术要点
检查井施工方面,应该注意以下问题:
1.无论是混凝土管道,还是金属类无压管道,只要其外壁与砌筑井壁洞圈之间为钢性连接,就要确保水泥砂浆应座浆饱满、密实。
2.对于金属类压力管道,井壁洞圈处应预设套管,并确保管道外壁与套管的间隙均匀,并采用柔性材料将间隙填嵌密实。
3.对于化学建材管道,应采用中介层法与井壁洞圈连接。4.在排水管道介入检查井时,要保持关口外缘与井内壁平齐。
三、关于管道方面的技术要点
(一)过街管安装的技术要点
1.要控制好管头插入检查井的长度,要保持和檢查井内壁持平,过长或过短都不行。同时采用砂浆与水泥配比二比一的泥砂浆抹平抹严。
2.与沉泥井相连一端的管子不宜过短,否则容易造成与沉泥井连接不上,需要重新接管。
3.安装过程中注意排水方向,防止出现倒坡现象。
4.管道内不能有泥土、砂浆、木块等杂物存在,管座混凝土需捣实,且与管壁紧密结合。
(二)顶管施工技术要点
顶管施工技术,是市政道路给排水工程中应用非常广泛的技术,通常在穿越公路、建筑、深埋等复杂的施工条件下适用。在顶管施工中,有以下技术要点需要注意:
1.对顶管工作井穿墙洞口前方进行灌浆止水工作时,洞口搅拌范围要控制在四米乘四米处。否则,可能造成工具头无法顺利出洞
2.顶进施工过程中,要控制好工具头的顶进速度,防止造成路面塌方。
3.整个顶进过程中要注意始终保持压浆,坚决杜绝在不压浆的情况下就顶进。
4.顶进过程要随时注意测量与纠偏。校正顶进方位,防止实际顶进线路与设计线路产生偏差。在顶进第一节管节时,每二十至五十米测量一次;而后的顶进过程中,每一米测量一次。以保证方向准确。在顶进过程中,要随时纠正工具头的方向。当工具头方向偏差超过五毫米,就应该调整纠偏千斤顶,控制顶进方向。
5.在第一节管顶进工作完成后,第二节管顶进工作开始前,要将千斤顶回缩并将水、电等拆开,然后再将千斤顶吊入下一节管段,调整位置,安装好管材接头止水材料,接通管线……对每一节管的操作都如此循环往复,切不可省略这些步骤,直接进入下一管段的顶进工作中。
6.顶管出洞口时,要对顶管机出洞口及周围的土体进行加固,起到挡土、阻水的作用,从而保证顶管机出洞安全。与此同时,要在工作井安装洞口止水设备,防止顶管机进出过程中的泥水流失。
四、管道测试方面的技术要点
在管道施工完成后,采用闭水法对管道进行检验以确保其严密性,是十分必要的环节。这能使我们及时发现和解决管道施工中的问题,避免留下安全和质量隐患,保证整个工程充分、稳定地发挥其使用功能。
在进行闭水法检查时,要注意以下几点:
1.对所有预留孔洞进行检查,确保全部预留孔洞都已经封堵完好。
2.彻底清理管道沟槽内的积水。
3.要确保管道两端的堵板有足够的承受力,要能承受闭水法实验的水压力。
4.在满水浸泡大于等于二十四小时后,从规定时间开始,全程观测管道的渗水量。观测时间不得少于半小时。
5.实验流程最好从上游向下游分段检查,以便节约水源。
五、回填方面的技术要点
井框与坑槽壁需要及时回填。回填材料可以选用在挖雨水井时,挖出来的三灰碎石、二灰土和素土,在回填过程中要注意分层夯实。在回填中要注意以下问题:
1.回填前如果发现沟槽中积水,要将积水清理后再进行回填。回填过程中也要防止雨水浸泡。
2.开槽时超挖的部分,回填时要用灌浆碎石填补,切记不可用素土。
3.安装雨水井与沉泥井的连接管时,要保证水流方向从雨水井平槽注入沉泥中,防止出现倒坡。
4.井盖由于灰口厚度掌握不准或者测量出差,会与边石不保持水平,如果高于边石,可以通过把井框边缘的混凝土砸掉一层来找平;反之,可以通过加大灰口来解决。
5.隔开雨水井和沉泥井的边石过厚,会导致两者间的间接管稍短。此时,可以将过街管砸断来代替。
结束语:市政道路给排水工程,是与城市发展、百姓生活、防汛抗涝等诸多方面都息息相关的工程项目。提高市政道路给排水工程的质量,能够从很大程度上促进城市现代化的进程和提高人民的生活水平。而提高质量的最主要也是最根本的途径,是在施工过程中注重先进技术的发明和应用。笔者希望通过对于市政道路给排水工程的施工技术方面的一些拙见,抛砖引玉,引起更多同行和有关部门对于市政道路给排水工程的关注,大家相互交流,共同进步,从而促进城市建设的发展。
参考文献:
[1]朱穗斌.市政给排水工程施工管理要点分析[J].科技信息(科学教研),2007(10).
[2]吴丽娟.城市污水管道顶管施工工艺及问题[J].科技资讯,2009(8).
[3]张闽.浅议市政给排水工程施工中质量的影响因素和项目质量控制[J].沿海企业与科技,2007,12.
[4]张小军.HDPE管在市政给排水工程应用中的几个问题[J].建材技术与应用,2007(7).
[5]张国荣,关英强,梁永田.给排水工程的非开挖拉管施工技术[J].中国新技术新产品,2010(22).