摘要:在我国的城市建设中,市政给排水工程是保障城市经济建设和人民群众日常生活的基础,给排水系统的科学规划与建设也是城市基础设施日趋完善的重要标志。近期在我省多个重大城市如广州、惠州等,由于雨期到来和雨量陡增,城市排水问题尤为突出。因此在市政给排水工程施工中,質量管理与控制是否达到预期的目标,将直接关系到城市整体功能的发挥,而且对于城市的环境保护、交通以及防汛都具有重要的作用,因此,适时加强对于市政给排水施工质量管理与控制的研究是十分必要的,而且对于城市的发展具有深远的意义。
关键词: 市政工程,给排水管道 ,施工管理
Abstract: in our city construction, the municipal water supply and drainage engineering is the guarantee urban economic development and People's Daily basis of life, water supply and drainage system of scientific planning and urban infrastructure construction is an important sign of improvement. Recent major cities such as more than in our province in guangzhou, huizhou, because of the rain coming and rainfall sharply, urban drainage problems particularly outstanding. So in the municipal water supply and drainage engineering construction, quality management and control is to achieve the expected goal, will directly related to the whole city function well, but also for protecting the environment of a city, transportation and flood control has important function, therefore, timely for municipal water supply and drainage construction quality to strengthen the management and control of the study is very necessary, but also for the development of the city has a profound meaning.
Keywords: municipal engineering, water supply and drainage pipe, construction management
中图分类号:TU99文献标识码:A 文章编号:
1施工准备阶段质量控制
1.1 道路拆除与恢复市政给排水管道施工必然涉及到一定路面的拆除与恢复工作,为了能够保证施工安全及路基质量,在道路开挖前应根据施工图纸计算开口宽度,标出开挖线之后用切割机将路面切断,用挖掘机对破碎的混凝土路面及碎石等垫层进行开挖并合理堆放以备后用,管路施工完成后的沟槽回填工作直接影响路面的质量及使用功能,尤其是在广东各大楼盘及城市快速开发的过程中更应注重沟槽回填质量,一般对回填土或砂采用夯实或灌水密实,之后采用压路机分层碾压,回填应分层回填及夯实,并应控制每层回填厚度不超过25cm,并应注意回填夯实过程中严格控制回填土进入井道、管道,以防堵塞。待其压实率达到95%以上后方可进行下道工序施工。
1.2 公共设施保护管道沟槽施工应根据土质情况采用支撑以免造成滑坡、塌方,若施工遇到建构筑物基础或电杆、灯杆等应制定防止下沉或变形措施后方可施工,一般应采用钢板桩加固方法;施工地区地下水量丰富则在管道施工过程中往往需要排水,应制定合理措施以保证地面不发生过大沉降而影响周围建构筑物使用安全;在埋有高压线地区内开挖时要求挖掘机不能在其正上方开挖,必要时采用人工开挖;开挖过程中遇到地下管线和各种构筑物应尽量迁移,若不能迁移应人工开挖使其外露之后采取吊托等加固措施。
2管道施工
2.1 沟槽开挖与支护开挖过程中应根据土壤类别及性质确定槽帮坡度,对于较深沟槽宜分层开挖,挖槽土方应合理安排堆放位置以防止塌方;如惠州较多大型开发靠近山区或河滩江滩,土质由坚硬的层岩到松软的沙土。土质的差别令到根据槽底宽、槽深边坡坡度及层间留台宽度来确定开槽断面,根据管道结构宽度加两侧工作宽度确定槽底宽度尤为重要;广东雨多,雨季施工应在沟槽四周叠筑土埂,必要时在埂外开挖排水沟以防止雨水流槽内,必要时加设集水井用泵抽水来防止槽底泡水;开挖过程中随时对槽底进行高程检验,采用机械开挖时在槽底高程以上20cm应改换人工进行清挖以防止超挖,若遇超挖应采用碎石回填到设计高程或填土夯实,并保证其密实度不低于天然地基密实度。
2.2 管基施工管道垫层应按照设计宽度、厚度进行摊铺,铺设完成后尽快浇筑混凝土以免对垫层造成破坏,基础混凝土浇筑一般采用钢模板立模,并应复核槽底标高和模板顶弹线高程,以确保平基厚度及高程,并防止支杆的支撑点不直接支在松散土层,采取加垫板或桩木的措施以保证其强度、刚度及稳定性;浇筑后应先用插入式振动器振实后用平板振动器振平及抹平,一般第一次先将基础浇筑成水平状之后浇筑管座。施工中若遇到雨水或其它客水进入沟槽,应采取排水措施将其清除干净之后铺设砂垫层以保证沟槽施工防止带泥水浇筑平基混凝土。
3管道安装
给水管一般采用从上向下安装,排水管采用自下游向上游安装,若管线质量较大应采用吊车吊装,吊车开行至沟缘2m处即应停止以避免沟壁坍塌,下管时应专人指挥,绑管子应找好重心,平吊轻放以免扰动基底管道相互碰撞,若施工现场狭窄不宜采用机械施工则应采用人工压绳下管,管路进入沟槽时应防止其与槽壁支撑及槽底或槽内管道碰撞,并应严格控制水平与方向.
排水管道安装必须严格按照施工工艺进行施工,管道安装前必须垫稳,不能有倒坡现象,管道内不能存有泥土、砂浆等杂物,管道接口缝隙宽度应均匀。若需水泥砂浆抹带施工则应严格控制砂浆配合比,并保证砂浆搅拌均匀以确保其强度及和易性,抹带施工前应将管外壁凿毛并洗刷干净,之后根据管径进行抹带施工.,抹完后进行覆盖洒水养护以防止空鼓、开裂;对于直径不大于600mm的管路,在抹带施工的同时应配合用麻袋球等在管道内来回拖动以便将流入管路的砂浆托平,对于管径大于600mm的管路应勾抹内管缝;若需铺设钢丝网加强则应保证钢丝网与管缝对中并保证其搭接长度和插入管座深度不小于10cm[2]。
4检查井、截门井施工
市政给排水检查井施工容易出现基础尺寸及高程偏差较大,井壁砌砖通缝、砂浆不密实、不饱满,抹灰面起鼓发裂等质量问题,因此在检查井及截门井施丁中应尽量避免带水浇筑垫层和基础,并要保证基础的几何尺寸和高程符合设计要求,并待垫层混凝土达到一定强度后方可砌砖施工;井壁砖砌筑应保证竖直度,不得有通缝,灰浆饱满,砖缝平整,抹面要压光,不能有空鼓、裂缝现象;污水检查井雨水流槽高度应与主管内顶相平,下半部分是与主管半径相同的半圆弧,上半部分与两侧井墙平行,其宽度与主管管径相同,雨水流槽高度应与主管半径相平,流槽形状应为与主管半径相同的半圆弧;井内踏步若为灰口铸铁材质必须保证其安装牢固,污水井内踏步必须刷防锈漆,井盖安装时必须保证井圈座浆饱满,井盖与井圈配套,必要时采用重型井盖。
5土方回填
应严格控制回填土土质,内部不能含有碎砖、石块、混凝土块及硬土块,回填土含水量应接近最佳含水量,进行回填前应对土壤进行标准击实试验,检测其最佳含水率及最大干密度:回填时应保证槽内无积水,并不能回填淤泥、腐殖土冻土及有机物;严格控制每层回填厚度不大干30cm.在夯实后对每层进行检测,合格后方可继续回填,并同时对管道两侧进行回填保证两侧高差不大于30cm;最终保证管沟胸腔部位密实度不小于90%,管顶上50cm范围内部位密实度应处于85%-90%之间,再向上部回填士密实度应同路基密实度相同。
3 结束语
总之,在市政给排水工程施工质量的管理与控制中,建设单位、设计单位、施工单位、监理单位首先要树立认真负责的工作态度和严谨的作风,特别在广东这个快速发展排前列的城市中,保证施工质量管控能力和水平提升的思想和认识基础。另外,由于市政给排水工程中涉及到的施工项目较多,所以只有在加强对于每一具体环节的质量管理与控制的基础上,才能有效防止市政给排水工程中各种常见的施工质量问题,全面提升我国市政排水工程的建设质量。
参考文献:
[1]李志鹏,等.给水排水工程(市政工程施工技术问答)[M].北京:中国电力出版社,2006.
[2]杨元顺,董建平.如何保证市政排水管道工程的施工质量[J].山西建筑,2006(15
关键词: 市政工程,给排水管道 ,施工管理
Abstract: in our city construction, the municipal water supply and drainage engineering is the guarantee urban economic development and People's Daily basis of life, water supply and drainage system of scientific planning and urban infrastructure construction is an important sign of improvement. Recent major cities such as more than in our province in guangzhou, huizhou, because of the rain coming and rainfall sharply, urban drainage problems particularly outstanding. So in the municipal water supply and drainage engineering construction, quality management and control is to achieve the expected goal, will directly related to the whole city function well, but also for protecting the environment of a city, transportation and flood control has important function, therefore, timely for municipal water supply and drainage construction quality to strengthen the management and control of the study is very necessary, but also for the development of the city has a profound meaning.
Keywords: municipal engineering, water supply and drainage pipe, construction management
中图分类号:TU99文献标识码:A 文章编号:
1施工准备阶段质量控制
1.1 道路拆除与恢复市政给排水管道施工必然涉及到一定路面的拆除与恢复工作,为了能够保证施工安全及路基质量,在道路开挖前应根据施工图纸计算开口宽度,标出开挖线之后用切割机将路面切断,用挖掘机对破碎的混凝土路面及碎石等垫层进行开挖并合理堆放以备后用,管路施工完成后的沟槽回填工作直接影响路面的质量及使用功能,尤其是在广东各大楼盘及城市快速开发的过程中更应注重沟槽回填质量,一般对回填土或砂采用夯实或灌水密实,之后采用压路机分层碾压,回填应分层回填及夯实,并应控制每层回填厚度不超过25cm,并应注意回填夯实过程中严格控制回填土进入井道、管道,以防堵塞。待其压实率达到95%以上后方可进行下道工序施工。
1.2 公共设施保护管道沟槽施工应根据土质情况采用支撑以免造成滑坡、塌方,若施工遇到建构筑物基础或电杆、灯杆等应制定防止下沉或变形措施后方可施工,一般应采用钢板桩加固方法;施工地区地下水量丰富则在管道施工过程中往往需要排水,应制定合理措施以保证地面不发生过大沉降而影响周围建构筑物使用安全;在埋有高压线地区内开挖时要求挖掘机不能在其正上方开挖,必要时采用人工开挖;开挖过程中遇到地下管线和各种构筑物应尽量迁移,若不能迁移应人工开挖使其外露之后采取吊托等加固措施。
2管道施工
2.1 沟槽开挖与支护开挖过程中应根据土壤类别及性质确定槽帮坡度,对于较深沟槽宜分层开挖,挖槽土方应合理安排堆放位置以防止塌方;如惠州较多大型开发靠近山区或河滩江滩,土质由坚硬的层岩到松软的沙土。土质的差别令到根据槽底宽、槽深边坡坡度及层间留台宽度来确定开槽断面,根据管道结构宽度加两侧工作宽度确定槽底宽度尤为重要;广东雨多,雨季施工应在沟槽四周叠筑土埂,必要时在埂外开挖排水沟以防止雨水流槽内,必要时加设集水井用泵抽水来防止槽底泡水;开挖过程中随时对槽底进行高程检验,采用机械开挖时在槽底高程以上20cm应改换人工进行清挖以防止超挖,若遇超挖应采用碎石回填到设计高程或填土夯实,并保证其密实度不低于天然地基密实度。
2.2 管基施工管道垫层应按照设计宽度、厚度进行摊铺,铺设完成后尽快浇筑混凝土以免对垫层造成破坏,基础混凝土浇筑一般采用钢模板立模,并应复核槽底标高和模板顶弹线高程,以确保平基厚度及高程,并防止支杆的支撑点不直接支在松散土层,采取加垫板或桩木的措施以保证其强度、刚度及稳定性;浇筑后应先用插入式振动器振实后用平板振动器振平及抹平,一般第一次先将基础浇筑成水平状之后浇筑管座。施工中若遇到雨水或其它客水进入沟槽,应采取排水措施将其清除干净之后铺设砂垫层以保证沟槽施工防止带泥水浇筑平基混凝土。
3管道安装
给水管一般采用从上向下安装,排水管采用自下游向上游安装,若管线质量较大应采用吊车吊装,吊车开行至沟缘2m处即应停止以避免沟壁坍塌,下管时应专人指挥,绑管子应找好重心,平吊轻放以免扰动基底管道相互碰撞,若施工现场狭窄不宜采用机械施工则应采用人工压绳下管,管路进入沟槽时应防止其与槽壁支撑及槽底或槽内管道碰撞,并应严格控制水平与方向.
排水管道安装必须严格按照施工工艺进行施工,管道安装前必须垫稳,不能有倒坡现象,管道内不能存有泥土、砂浆等杂物,管道接口缝隙宽度应均匀。若需水泥砂浆抹带施工则应严格控制砂浆配合比,并保证砂浆搅拌均匀以确保其强度及和易性,抹带施工前应将管外壁凿毛并洗刷干净,之后根据管径进行抹带施工.,抹完后进行覆盖洒水养护以防止空鼓、开裂;对于直径不大于600mm的管路,在抹带施工的同时应配合用麻袋球等在管道内来回拖动以便将流入管路的砂浆托平,对于管径大于600mm的管路应勾抹内管缝;若需铺设钢丝网加强则应保证钢丝网与管缝对中并保证其搭接长度和插入管座深度不小于10cm[2]。
4检查井、截门井施工
市政给排水检查井施工容易出现基础尺寸及高程偏差较大,井壁砌砖通缝、砂浆不密实、不饱满,抹灰面起鼓发裂等质量问题,因此在检查井及截门井施丁中应尽量避免带水浇筑垫层和基础,并要保证基础的几何尺寸和高程符合设计要求,并待垫层混凝土达到一定强度后方可砌砖施工;井壁砖砌筑应保证竖直度,不得有通缝,灰浆饱满,砖缝平整,抹面要压光,不能有空鼓、裂缝现象;污水检查井雨水流槽高度应与主管内顶相平,下半部分是与主管半径相同的半圆弧,上半部分与两侧井墙平行,其宽度与主管管径相同,雨水流槽高度应与主管半径相平,流槽形状应为与主管半径相同的半圆弧;井内踏步若为灰口铸铁材质必须保证其安装牢固,污水井内踏步必须刷防锈漆,井盖安装时必须保证井圈座浆饱满,井盖与井圈配套,必要时采用重型井盖。
5土方回填
应严格控制回填土土质,内部不能含有碎砖、石块、混凝土块及硬土块,回填土含水量应接近最佳含水量,进行回填前应对土壤进行标准击实试验,检测其最佳含水率及最大干密度:回填时应保证槽内无积水,并不能回填淤泥、腐殖土冻土及有机物;严格控制每层回填厚度不大干30cm.在夯实后对每层进行检测,合格后方可继续回填,并同时对管道两侧进行回填保证两侧高差不大于30cm;最终保证管沟胸腔部位密实度不小于90%,管顶上50cm范围内部位密实度应处于85%-90%之间,再向上部回填士密实度应同路基密实度相同。
3 结束语
总之,在市政给排水工程施工质量的管理与控制中,建设单位、设计单位、施工单位、监理单位首先要树立认真负责的工作态度和严谨的作风,特别在广东这个快速发展排前列的城市中,保证施工质量管控能力和水平提升的思想和认识基础。另外,由于市政给排水工程中涉及到的施工项目较多,所以只有在加强对于每一具体环节的质量管理与控制的基础上,才能有效防止市政给排水工程中各种常见的施工质量问题,全面提升我国市政排水工程的建设质量。