从1986年以来,我院先后承担了河南郑州、鹤壁、平顶山、焦作、禹县、湖南涟邵,河北邯郸等矿区的总体发展规划设计,总规模达6000万t/a.还参加了山西潞安、大同等矿区的总体发展规划的审查.这些矿区均有几十年的开采历史,绝大部分矿区过去都曾编制过总体规划设计,但经过多年开发,随着时间的推移和矿井技术进步,面貌已有了很大的变化,原总体规划设计已不能适应客观发展的需要,不能指导矿区的生产建设.为此,要求编制矿区总体发展规划,作为指导这些矿区生产建设的依据是十分必要的.
Since 1986, our institute has successively undertaken the overall development planning and design for the mining areas in Zhengzhou, Hebi, Pingdingshan, Jiaozuo, Yu County, Hunan, Shaolin, Handan and other mining areas in Henan Province, with a total scale of 60 million t / a. An, Datong and other mining areas of the overall development plan review of these mines have several decades of mining history, the vast majority of mining areas in the past have prepared the overall planning and design, but after years of development, and over time mine technology and progress , The face has been greatly changed, the original overall planning and design has been unable to meet the needs of objective development, can not guide the production and construction of mining areas .To this end, the preparation of the overall development plan for the mining area, as a guide to the production of these mining area is based on the necessary of.