铁道部基建总局于1985年9月17日~22日在大连召开了《铁路轨道工程施工技术规则》送审稿审查会议。其中有关轨缝问题,由于现行规则规定不完善,且部分条文内容有误,因此在这次修订中作了较大的修改和补充。经大连会议审查后决定:“有关轨缝问题的内容,因涉及面较广,问题也较复杂,待另安排专题研讨解决”。本文拟结合大连会议对该问题的讨论情况,谈些初步意见,希望有关同志积极参加讨论,共同完成该规则的修订工作。关于预留轨缝计算式修订稿中的预留轨缝,仍沿用现行规则
The Infrastructure Department of the Ministry of Railways convened a draft review meeting for reviewing and drafting the “Technical Regulations for Construction of Railway Track Engineering” in Dalian from September 17 to September 22, 1985. Among them, the issue of orbital suture, due to imperfect provisions of the existing rules, and some provisions of the contents of the error, so in this revision made a major change and supplement. After examination at the meeting in Dalian decided: “The contents of the issue of orbital suture, because of the broader coverage, the problem is more complex, to be arranged for special seminars to resolve.” This article intends to discuss the situation in Dalian meeting on this issue, talk about some preliminary opinions, and hope that the gay people actively participate in the discussion and jointly complete the revision of the rules. With regard to the reservation of the track in the revised version of the reserved track calculation, the current rules are still used