论文部分内容阅读
本文从三个方面论述了综合布线系统与土建设计和施工的配合及管槽系统设计的主要要求。
This article discusses the main requirements for the coordination of integrated wiring system, civil engineering design and construction, and the design of tube-trough system from three aspects.