摘要:百年大计,质量第一。土建工程质量控制监督就是按照合同的相关规定,根据图纸的设计以及专业相关的法规、质量验收的标准等内容,围绕与工程质量相关的诸多因素,对土建工程项目施工过程中的各个环节进行全面的控制与监督,从而达到合同事先所约定的高质量。本文从土建工程控制质量监督工作的实际情况出发,结合相关的规范与标准,对土建工程质量控制监督管理进行研究。
关键词:土建工程;质量控制监督;管理
Abstract: the important project, quality first. The project quality control supervision is in accordance with the relevant provisions of the contract, according to the drawings of the designas well as the laws and regulations, quality acceptance of professional standards related tomany factors such as content, around and engineering quality related, control and supervisionof each link of the whole surface of the civil engineering project in the construction process, so as to achieve high quality agreed contract. Starting with current situation of civil engineeringquality control supervision work, combined with the norms and standards related to, conducts the research to the supervision and management of civil engineering quality control.
Keywords: Civil Engineering; quality control; management
中图分类号: D035.4文献标识码:A文章编号:2095-2104(2013)
土建工程的施工阶段,不仅仅是将设计意图转化为工程实体的阶段,而且还是工程项目质量形成的关键阶段,工程的使用价值如何主要取决于此阶段。土建工程的质量不仅与工程项目的成效有密切联系,而且与居民的生命财产有着密切的关系,因此土建工程质量控制监督管理工作十分重要。
一、施工准备阶段质量控制
施工准备阶段主要是指工程真正实施之前的阶段,该阶段控制的主要内容是那些可能会影响工程质量的诸多因素,如施工人员、施工机械、施工方法以及施工材料等,对这些因素进行控制,一方面有助于施工成本的降低,避免施工过程当中造成不必要的浪费,另一方面可以确保施工过程的顺利进行与工程质量的理想目标,这些因素不仅与工程实施密切相关,而且是施工质量有所保证的首要条件。
(一)承包单位资质核查
核查承包单位资质是施工准备阶段质量控制监督管理的首要任务。通常情况下,承包工程的单位的资质已经在招标阶段被相关建设单位和招标代理单位完成了审核的相关事项,所以,在这种情况下,负责项目质量控制监督管理的相关人员首先应该提醒与督促承包工程的单位将其相关资质证明的资料提交到相关简历结构备案,其次要对承包单位的质量管理体系进行详细的审查,看其体系是否能够真正满足本工程质量的要求,从而及时发现不符合要求的承包单位与管理体系以督促其及时整改,避免对土建工程的质量产生消极影响。除审查承包单位的相关资质证明外,对承包单位相关管理人员以及与工程质量密切相关的工作人员的资格证等有效证明也要进行审查,尤其是分包工程的相关工作人员。
(二)现场相关工作人员资格的审查
对现场相关工作人员的资格进行审查,首先要求项目相关人员,尤其是专职管理人员要具备相应的职业资格证书与实际胜任该管理工作的能力,其中,人与证件相统一是必须的。其次要求从事不同工种的施工人员在配置上与数量上能够满足施工的具体需要,这是切实保证工程施工顺利进行的首要条件,其中,值得特殊强调的是,从事特殊工种的相关工作人员必须持有与本人相符的上岗证。
(三)设计交底与图纸会审
设计交底与图纸会审主要目的是了解设计的主要内容、原则、要求以及相关注意事项等问题。在对图纸进行会审之前,要组织多专业的相关专业工程师对图纸进行了解与熟悉,并对提醒与督促相关施工单位审核图纸与核对图纸工作的进行。此外,设计交底与图纸会审的主要意义在于发现问题、解决问题,具体来讲就是通过这一环节发现图纸当中的一些影响工程质量或难以达到要求的问题,在设计单位进行解释与分析之后,确定图纸存在的问题以及问题的解决方案。最后,设计交底与图纸会审的具体经过与记录要各方签字,作为工程质量控制监督管理的依据。
(四)施工机械配置的控制
在施工机械进场之前,施工单位要将需要进场的机械设备列为清单并报送到相关单位,清单当中要详细客观地列出需要进场的设备的规格、数量、性能以及其他状况等内容,越详细越好。在施工机械进场之后,要对这些设备的数量与质量进行检查,与清单进行核对,看其规格、数量等内容是否与实际相符,同时要对各机械设备进行实验性操作,看其性能是否处于良好可用的状态。其中,对于对安全有较高要求的诸如打桩机这样的大型机械,不仅要有相关检测部门的合格鉴定,而且要报到建设工程安全生产监督管理的相关部门进行登记,然后才可以真正投入到工程当中使用。
(五)施工技术交底的控制与监督
施工技术交底主要是指设计与方案的进一步具体化,既包括施工组织设计也包括施工方案,目的不仅是为了让相关指导方案更加具体、详细,更是为了确保工程质量符合要求。相关项目监督管理部门要严格要求承包单位技术交底工作,主要是检验批、分项工程施工前两部分,让具体施工人员在通过这一工作之后对工作方法、质量标准、验收要求以及实际施工过程当中可能遇到的问题以及可能出现的意外进行事先的了解,从而有所准备,一则提高施工质量,二则避免不良情况发生。技术交底书同样需要双发签字,然后送往相关监督管理结构进行审核与备案。
二、施工过程质量控制
(一)施工单位质量自检体系的建立
承包单位不仅是工程的实际实施者,而且是工程质量的直接承担者,承包单位健全工程质量自检体系,不仅有助于工程质量的理想完成,而且有助于整个工程的顺利开展。首先,各工种、各施工环节的相关人员在对其工作阶段性结束后要进行自我检验,自己检查自己施工的质量,发现自己施工所存在的问题并主动的、积极的进行解决问题。其次,在不同工序进行交接的过程当中,交接双方的工作人员要对彼此有所交代,已完成的施工人员要对自己的施工做简要的总结,而未开始施工的施工人员则要认真检查前者的施工成果,尤其是在质量方面,发现问题及时沟通、及时解决。出施工人员的自我检验之外,承包单位要设置专门进行质量检查工作的检查人员,从而确保自检工作的严格完成。
(二)施工现场的监督与检查
監督管理人员在现场可通过巡视对施工现场进行检查,可定期检查,也可不定期检查,如检查工程实施是否符合合同规定,如施工工艺是否符合设计要求与图纸相符等。对于施工过程当中的部分关键程序,监督管理人员需要对其进行全程式的监督,如混凝土浇注环节的施工,监督管理人员要旁站对施工进行监督,施工单位要尽可能的提前通知相关监督管理人员或相关监督管理机构,从而保障监督管理工作能够切实实施。此外,还有一种经常使用的检验方法叫做平行检验,该检验方法主要是监督管理人员根据设计图纸、相关标准与规范为依据,在施工单位自检的前提之下对工程质量进行复检的重要方式,在具体的检验工作当中应用十分广泛。
三、总结
土建工程的质量控制监督管理工作是一项重要的工作,不仅贯穿于土建工程实施的各个环节,而且直接关系着土建工程的最终质量,因此,需要给予应有的重视。土建工程质量控制监督管理工作涉及到施工前准备、施工中、施工后验收等多个环节,本文主要从施工前准备与施工过程中两个环节进行了一定的论述,还需要进行更加详细、完整的论述。
参考文献:
[1]李瑞戈.土建工程质量控制监督管理研究[J].科技信息,2011(10)
[2]闫永君.浅谈土建工程质量控制监督管理研究[J].科技致富向导,2012(01)
关键词:土建工程;质量控制监督;管理
Abstract: the important project, quality first. The project quality control supervision is in accordance with the relevant provisions of the contract, according to the drawings of the designas well as the laws and regulations, quality acceptance of professional standards related tomany factors such as content, around and engineering quality related, control and supervisionof each link of the whole surface of the civil engineering project in the construction process, so as to achieve high quality agreed contract. Starting with current situation of civil engineeringquality control supervision work, combined with the norms and standards related to, conducts the research to the supervision and management of civil engineering quality control.
Keywords: Civil Engineering; quality control; management
中图分类号: D035.4文献标识码:A文章编号:2095-2104(2013)
土建工程的施工阶段,不仅仅是将设计意图转化为工程实体的阶段,而且还是工程项目质量形成的关键阶段,工程的使用价值如何主要取决于此阶段。土建工程的质量不仅与工程项目的成效有密切联系,而且与居民的生命财产有着密切的关系,因此土建工程质量控制监督管理工作十分重要。
一、施工准备阶段质量控制
施工准备阶段主要是指工程真正实施之前的阶段,该阶段控制的主要内容是那些可能会影响工程质量的诸多因素,如施工人员、施工机械、施工方法以及施工材料等,对这些因素进行控制,一方面有助于施工成本的降低,避免施工过程当中造成不必要的浪费,另一方面可以确保施工过程的顺利进行与工程质量的理想目标,这些因素不仅与工程实施密切相关,而且是施工质量有所保证的首要条件。
(一)承包单位资质核查
核查承包单位资质是施工准备阶段质量控制监督管理的首要任务。通常情况下,承包工程的单位的资质已经在招标阶段被相关建设单位和招标代理单位完成了审核的相关事项,所以,在这种情况下,负责项目质量控制监督管理的相关人员首先应该提醒与督促承包工程的单位将其相关资质证明的资料提交到相关简历结构备案,其次要对承包单位的质量管理体系进行详细的审查,看其体系是否能够真正满足本工程质量的要求,从而及时发现不符合要求的承包单位与管理体系以督促其及时整改,避免对土建工程的质量产生消极影响。除审查承包单位的相关资质证明外,对承包单位相关管理人员以及与工程质量密切相关的工作人员的资格证等有效证明也要进行审查,尤其是分包工程的相关工作人员。
(二)现场相关工作人员资格的审查
对现场相关工作人员的资格进行审查,首先要求项目相关人员,尤其是专职管理人员要具备相应的职业资格证书与实际胜任该管理工作的能力,其中,人与证件相统一是必须的。其次要求从事不同工种的施工人员在配置上与数量上能够满足施工的具体需要,这是切实保证工程施工顺利进行的首要条件,其中,值得特殊强调的是,从事特殊工种的相关工作人员必须持有与本人相符的上岗证。
(三)设计交底与图纸会审
设计交底与图纸会审主要目的是了解设计的主要内容、原则、要求以及相关注意事项等问题。在对图纸进行会审之前,要组织多专业的相关专业工程师对图纸进行了解与熟悉,并对提醒与督促相关施工单位审核图纸与核对图纸工作的进行。此外,设计交底与图纸会审的主要意义在于发现问题、解决问题,具体来讲就是通过这一环节发现图纸当中的一些影响工程质量或难以达到要求的问题,在设计单位进行解释与分析之后,确定图纸存在的问题以及问题的解决方案。最后,设计交底与图纸会审的具体经过与记录要各方签字,作为工程质量控制监督管理的依据。
(四)施工机械配置的控制
在施工机械进场之前,施工单位要将需要进场的机械设备列为清单并报送到相关单位,清单当中要详细客观地列出需要进场的设备的规格、数量、性能以及其他状况等内容,越详细越好。在施工机械进场之后,要对这些设备的数量与质量进行检查,与清单进行核对,看其规格、数量等内容是否与实际相符,同时要对各机械设备进行实验性操作,看其性能是否处于良好可用的状态。其中,对于对安全有较高要求的诸如打桩机这样的大型机械,不仅要有相关检测部门的合格鉴定,而且要报到建设工程安全生产监督管理的相关部门进行登记,然后才可以真正投入到工程当中使用。
(五)施工技术交底的控制与监督
施工技术交底主要是指设计与方案的进一步具体化,既包括施工组织设计也包括施工方案,目的不仅是为了让相关指导方案更加具体、详细,更是为了确保工程质量符合要求。相关项目监督管理部门要严格要求承包单位技术交底工作,主要是检验批、分项工程施工前两部分,让具体施工人员在通过这一工作之后对工作方法、质量标准、验收要求以及实际施工过程当中可能遇到的问题以及可能出现的意外进行事先的了解,从而有所准备,一则提高施工质量,二则避免不良情况发生。技术交底书同样需要双发签字,然后送往相关监督管理结构进行审核与备案。
二、施工过程质量控制
(一)施工单位质量自检体系的建立
承包单位不仅是工程的实际实施者,而且是工程质量的直接承担者,承包单位健全工程质量自检体系,不仅有助于工程质量的理想完成,而且有助于整个工程的顺利开展。首先,各工种、各施工环节的相关人员在对其工作阶段性结束后要进行自我检验,自己检查自己施工的质量,发现自己施工所存在的问题并主动的、积极的进行解决问题。其次,在不同工序进行交接的过程当中,交接双方的工作人员要对彼此有所交代,已完成的施工人员要对自己的施工做简要的总结,而未开始施工的施工人员则要认真检查前者的施工成果,尤其是在质量方面,发现问题及时沟通、及时解决。出施工人员的自我检验之外,承包单位要设置专门进行质量检查工作的检查人员,从而确保自检工作的严格完成。
(二)施工现场的监督与检查
監督管理人员在现场可通过巡视对施工现场进行检查,可定期检查,也可不定期检查,如检查工程实施是否符合合同规定,如施工工艺是否符合设计要求与图纸相符等。对于施工过程当中的部分关键程序,监督管理人员需要对其进行全程式的监督,如混凝土浇注环节的施工,监督管理人员要旁站对施工进行监督,施工单位要尽可能的提前通知相关监督管理人员或相关监督管理机构,从而保障监督管理工作能够切实实施。此外,还有一种经常使用的检验方法叫做平行检验,该检验方法主要是监督管理人员根据设计图纸、相关标准与规范为依据,在施工单位自检的前提之下对工程质量进行复检的重要方式,在具体的检验工作当中应用十分广泛。
三、总结
土建工程的质量控制监督管理工作是一项重要的工作,不仅贯穿于土建工程实施的各个环节,而且直接关系着土建工程的最终质量,因此,需要给予应有的重视。土建工程质量控制监督管理工作涉及到施工前准备、施工中、施工后验收等多个环节,本文主要从施工前准备与施工过程中两个环节进行了一定的论述,还需要进行更加详细、完整的论述。