论文部分内容阅读
通过大型采场模型模拟试验,得出了块石胶结充填新工艺实施中的关键技术与参数。据此,在铜陵新桥硫铁矿建成了一套较为完备的块石胶结充填系统,并投入了生产,大大改善了第二步回采的安全,每年可节约充填材料成本达420~500万元,经济效益显著。该成果将为类似矿山采用这一技术提供了成功的借鉴经验。
Through the large-scale stope simulation research, the key technologies and parameters in the implementation of new technology of block stone cement filling were obtained. Accordingly, a complete set of block stone cementation filling system was built in Tongling Xinqiao Pyrite Mine, and put into production, which greatly improved the safety of the second step of mining. The cost of filling materials can be saved from 4 to 5 million yuan , Significant economic benefits. This result will provide a successful reference for the adoption of this technology in similar mines.