论文部分内容阅读
桂林漓江补水工程的重点是青狮潭水库灌区工程防渗加固配套。自1986年冬以来,工程指挥部以大量投入对灌区的漏水段,险工险段进行了防渗加固,面貌有了很大改变,漏水显著减少。遏止了自1981年以来灌区逐年收缩,效益逐年衰减的颓势。至1989~1990年已逐步有所恢复。消除了灌区农民对青狮潭补水漓江的疑虑。 1 防渗节流效果补水工程实施重点是对漏水段的治理,通过治理总的止漏量达4.0m~3/s以上、比较显著的有西干庄屋瓜段,1986年漏水量0.764m~3/s,1990年
Guilin Lijiang River water recharge project is the focus of Qingshitan Reservoir Irrigation seepage reinforcement project. Since the winter of 1986, with a large amount of investment, the engineering headquarters has carried out seepage prevention and reinforcement of the leaking section and the dangerous section of irrigation in the irrigation area. The appearance has been greatly changed, and the leakage has been significantly reduced. This has stopped the decline of the irrigated area since 1981, which has been declining year after year. From 1989 to 1990, it gradually recovered. Eliminate the irrational farmers in Qingshuitan water Lijiang River doubts. 1 seepage control effect of water recharge project implementation focus is on the leaking section of the governance, through the treatment of the total leakage of up to 4.0m ~ 3 / s or more, there is a significant Xizang Zhuanggua melons, 1986 leakage of 0.764m ~ 3 / s, 1990