论文部分内容阅读
荆江河湾观测队这次在荆江二、三、四段工作时,遇到了芦柴林阻碍通视问题。经过同志们几次研究,想出了用脚、扁担、寸踩推芦柴的办法,试用很有效,现在从原来每天推2,500米左右提高到可以推3,500米左右。具体做法:①导线长度到300~400米要选埋基椿一根,否则导线被推倒两边的芦柴飘摆遮碍视线。②把作为椿的标结竹杆裁短(4米左右)用来推导线芦柴,用扁担推横断面(因横断面短,最长不过200米)。③适当改变劳动组合。推踩芦柴的几种情况:
Jingjiang Bay observation team this time in Jingjiang two, three, four work encountered Lu Chailin obstruction of the issue of vision. After several studies by my comrades, I came up with the idea of using a foot, a pole, and an inch of lumber to try my hand. The trial was very effective. Now it is about 2,500 meters a day pushing it up to 3,500 meters. The specific approach: ① wire length to 300 to 400 meters to choose a buried Chun, or wires were pushed down on both sides of Luchai drift obstructing sight. (2) The standard bamboo knot as a tail cut (about 4 meters) is used to infer the line Luchai, with a cross-section of the cross-section (due to the short cross-section, but up to 200 meters). ③ appropriate to change the labor mix. Push the fire Luchai several cases: