杭州丰潭路延伸段全长1.2km,总造价近1600万元,开通不到一年半,维修费用已达百万元。可谓是花大钱,很费时,又十分误事,弊端显而易见。问题是:这样的公共建筑还有多少?工程投资越大为何反而越不健康?无论是武汉长江三桥,还是杭州丰潭路延伸段,从建设到验收似乎都中规中矩,而后者更是通过6家单位验收合格,可谓无懈可击。但出了问题已是事实,为什么相关部门没有人去及时关注?
Hangzhou Feng Tam Road extension of the full-length 1.2km, the total cost of nearly 16 million yuan, opened less than a year and a half, the cost of maintenance has reached 1 million yuan. Can be described as spending big money, it is time-consuming, but also very misconduct, the drawbacks obvious. The question is: how much of such a public building? Project investment, but why the more the more unhealthy? Whether it is Wuhan Yangtze River Bridge, or Hangzhou Feng Tan Road extension, from construction to acceptance seems quite satisfactory, and the latter is through 6 Unit acceptance, can be described as impeccable. However, the problem is a fact, why no one to the relevant departments to timely attention?