论文部分内容阅读
红枫湖大桥采用劲性骨架法进行边跨和主跨的合龙,并通过采取了一系列确保合龙段施工质量的措施,保证了合龙段施工过程中结构受力的安全和主梁线形的平顺。
The Hongfeng Lake Bridge adopts the rigid skeleton method for closing the side span and the main span, and by adopting a series of measures to ensure the construction quality of the closure segment, it ensures the structural safety of the closure process and the smooth profile of the main beam .