双曲线冷却塔筒壁结构滑模工艺的施工,采用斜门架系统,系将门架沿筒壁环向等距倾斜设置,滑升时门架倾角与所在部位筒壁中心线的切线角始终保持一致。门架间设有交叉斜撑、水平连杆及通向各个门架的辐射状控园拉索。整套系统的滑升,由各个门架上的爬升千斤顶完成,滑升过程中门架系统的各种变量,由高压油缸带动机传装置,通过电气控制统一操作,达到变径、变坡的目的。取消一般滑模施工中的支承杆,采用工具式吊杆及千斤顶,经小门架将作用力传递到混凝土筒壁上。
In the construction of the sliding die process of the hyperbolic cooling tower wall structure, an inclined portal system is used to set the mast equidistantly along the cylinder wall. During the sliding, the inclination of the mast and the tangential angle of the centerline of the cylinder wall are always maintained. Consistent. There are cross braces, horizontal links and radiating controlled park cables leading to each gantry. The sliding of the whole system is completed by the climbing jacks on each gantry. During the sliding process, various variables of the gantry system are driven by high-pressure cylinders and conveyed by the motives. Through the electric control, the operation is performed uniformly to achieve the purpose of changing the diameter and changing the slope. . The support rods in the general sliding mode construction are cancelled, and the tool-type suspension rods and jacks are used to transmit the force through the small gantry to the concrete wall.