冶金部第十七冶金建设公司施工的马鞍山钢铁公司2500m~3高炉基础.混凝土总量4500m~3,设计标号200号,采用矿渣425号水泥、高炉重矿渣碎石、木钠减水剂,水泥用量275kg/m~3,于1987年12月和1988年1月分两次浇灌。混凝土由搅拌站集中供应,采用7小时热水法快速推定28天强度,加强了质量控制。第一层3200m~3混凝土的标准试块检验结果完全符合要求。施工采用泵送混凝土工艺,预埋热电阻与数学显示仪配套进行测温,浇灌后搭棚并通蒸汽进行养护,做到混凝上内外温差不大于25℃,未出现温度裂缝。
The 2500m~3 blast furnace foundation of Ma’anshan Iron and Steel Company constructed by the Ministry of Metallurgy No.17 Metallurgical Construction Company. The total amount of concrete is 4500m~3, and the design number is No. 200. The slag No. 425 cement, blast furnace heavy slag gravel, wood sodium water reducer, cement The dosage was 275kg/m~3 and it was watered twice in December 1987 and January 1988. The concrete is supplied by the mixing station in a concentrated manner, and the 7-hour hot water method is used to quickly estimate the strength for 28 days, thus strengthening the quality control. The test results of the standard test block of the first 3,200 m~3 concrete fully meet the requirements. The construction adopts the process of pumping concrete. The pre-embedded thermal resistance is matched with the mathematic indicator to measure the temperature. After watering, it is scaffolded and steamed for maintenance. The temperature difference between the inside and outside of the coagulation is not greater than 25°C, and no temperature cracks occur.