澜沧江糯扎渡水电站,是云南省建成的最大的水力发电站。电站位于云南省普洱市境内,是澜沧江中下游河段梯级规划“二库八级”中第5级,电站挡水建筑为心墙堆石坝,最大坝高261.5m,水库正常蓄水位812m,总库容227.41 x 108m3,调节库容113.35 x108m3,相当于16个滇池的蓄水量。设计安装9台650 M W机组,总装机容量5850 MW,年平均发电量为239.12 x 108 kW·h,由华能澜沧江水电有限公司投资开发。
Lancang Nuozhadu Hydropower Station, is built in Yunnan Province, the largest hydroelectric power station. The power station is located in Pu’er City, Yunnan Province, and is the cascade plan of the middle and lower reaches of the Lancang River. It is the fifth grade of “two reservoirs and eight levees”, and the retaining structure of the power station is a core rockfill dam with a maximum dam height of 261.5m and normal reservoir impoundment Bit 812m, total capacity of 227.41 x 108m3, adjust the storage capacity of 113.35 x108m3, equivalent to 16 Dianchi Lake water storage capacity. Nine 650 MW units were designed and installed with a total installed capacity of 5850 MW and annual average generating capacity of 239.12 x 108 kW · h, which was invested and developed by Huaneng Lancangjiang Hydropower Co., Ltd.