京九铁路(北京经深圳连接香港九龙)是“八五”计划中重点工程项目,也是我国铁路走出“瓶颈”的关键之举。京九铁路在我国线路最长、工程量浩大、桥梁繁多,仅铁道部第三勘测设计院承担的北京至山东荷泽段就有特大桥24座,大桥35座,中桥161座,小桥74座,涵洞2240座,京九铁路与正在兴建的北京西客站接轨,西客站28公里的西长线又有特大桥8座,中、小桥24座,桥梁工程之大,可见一斑。
Beijing-Kowloon Railway (Beijing via Hong Kong, Kowloon, Hong Kong) is a key project in the “Eighth Five-Year Plan” and is also the key move for our country’s railways to get out of the bottleneck. Beijing-Kowloon Railway in China longest line, a huge amount of engineering, a wide range of bridges, only the Ministry of Railways Third Survey and Design Institute Beijing to Shandong Heze section there are 24 large bridges, 35 bridges, bridge 161, bridge There are 74 seats and 2240 culverts. The Beijing-Kowloon Railway is connected with the Beijing West Railway Station under construction. There are 8 super-long bridges and 24 medium and small bridges on the west longitude of 28 km west of the railway station. The large bridge works are evident.