5.现行计划预修制度的一些规定,从某种程度上说,尚未经过工艺设备使用实践的验证。这里指的首先是修理劳动量和修理间隔周期长短的确定。 例如,根据计划预修制度的规定,修理的单位劳动量是按修理类别确定的。实际证明,修理劳动量要取决于设备的适修性和复杂性:随着修理复杂程度等级的增高及适修性的降低,修理劳动量即增加。 计划预修制度对下述两项极为重要的因素未作充分的考虑:设备工作规范的强度和对设备精度性能的要求。 按照笔者的看法,修理间隔周期的长短并不决定于设备在何种生产方式下使用,而是首先取决于工作(切削)规范的强度。十分常见的情况是:同一种型号的设备在单件生产中使用时其切削规范比大量生产中高,或者情况相反。但是,按照计划预修制度的规定,第一种情况下的修理间隔周期的延续时间要比第二种情况长。同时,计划预修制度建议对所有各种设备用考虑生产方式的系数来修正修理间隔周期的长短。但是,比如对于在精加工工序中使用的机床,修理间隔
5. Some provisions of the current plan pre-repair system, to some extent, have not been verified by the use of process equipment. The first point here refers to the determination of the amount of repair work and the length of the repair interval. For example, according to the plan pre-repair system, the amount of unit labor that is repaired is determined according to the type of repair. The actual proof is that the amount of repair work depends on the suitability and complexity of the equipment: as the level of repair complexity increases and the degree of fit decreases, the amount of repair work increases. The planned pre-repair system does not give full consideration to the following two most important factors: the strength of the equipment work specification and the requirements on the accuracy performance of the equipment. According to the author’s opinion, the length of the repair interval period is not determined by the production method of the equipment, but depends first on the strength of the work (cutting) specification. A very common situation is when the same type of equipment is used in single piece production, its cutting specification is higher than in mass production, or the situation is reversed. However, according to the planned pre-repair system, the duration of the repair interval in the first case is longer than the second case. At the same time, the plan pre-repair system proposes that the length of the repair interval period be corrected for all kinds of equipment by considering the coefficient of the production method. However, for example, for the machine tool used in the finishing process, the repair interval