论文部分内容阅读
据《新疆日报》报道,日前,哈密至额济纳铁路项目可行性研究报告获国家发改委批复,库尔勒至格尔木铁路项目也于近日通过可研评审,两条铁路有望2014年开工建设,新疆一南一北两条通道将变得更加通畅。哈密至额济纳铁路项目是密切新疆与华北地区经济联系、发挥出疆第二通道整体效益的重要通道。新建线路全长约629.8 km,也是新疆北路大通道中的重要组成部分。库尔勒至格尔木铁路是我国通往西亚、地中海和黑海地区的陆路运输大通道,是新疆南通道的重要组成部分。该项目正线全长
According to “Xinjiang Daily” reported that recently, the feasibility study report of Hami to Ejin railway project was approved by National Development and Reform Commission, and the project from Korla to Golmud passed the feasibility study recently. The two railways are expected to start construction in 2014, Two channels will become more smooth. Hami to Ejin railway project is to close the economic ties between Xinjiang and North China, to play an important channel of Xinjiang’s second channel overall effectiveness. The new route has a total length of about 629.8 km and is also an important part of the Xinjiang Grand Corridor. Korla to Golmud Railway is the major road transport corridor to China in West Asia, the Mediterranean and the Black Sea and is an important part of the South Passage of Xinjiang. The project is full length