2014年5月30日,晋煤金石集团藁城分公司一期一系列合成氨系统实现全线工艺流程贯通,产出合格液氨。该项目位于河北石家庄循环经济化工园区,占地面积849.7亩,装置占地面积722亩,计划总投资45亿元,2008年3月21日举行开工奠基仪式,分两期建设总氨生产能力60万吨大型煤气化装置。项目采用了鲁奇炉加压气化制气、低温甲醇洗净化、变压吸附提氢、荷兰克劳斯硫回收、
On May 30, 2014, a series of synthetic ammonia systems of Phase I of Jincheng Group Baocheng Branch realized the whole process flow through and produced qualified liquid ammonia. The project is located in Shijiazhuang, Hebei Recycling Economy and Chemical Industry Park, covers an area of 849.7 acres, the device covers an area of 722 acres, plans a total investment of 4.5 billion yuan, March 21, 2008 groundbreaking ceremony held in two phases total ammonia production capacity of 60 Ten thousand tons of large-scale coal gasification plant. The project uses the Lurgi furnace pressurized gasification gas, low temperature methanol wash purification, pressure swing adsorption hydrogen extraction, the Netherlands Claus sulfur recovery,