襄渝线大巴山隧道垒长5333.7米,衬砌有模注混凝土和喷射混凝土两种类型,采用钢筋混凝土支承块中心水沟式整体道床。该隧道于1972年底竣工,1978年6月交付运营。现因整体道床病害严重,危及行车安全,限速每小时40公里运行;且渗漏水亦颇严重。为此,铁道部科技局会同基建总局,于1980年5月26日至6月11日,在路内有关单位参加下,对大巴山隧道病害进行现场调查,提出整治意见和科研课题如下: 1.排水系统的整治加长水沟,其深度应保证最高流水位低于基底20厘米以下。道床病害或渗水严重地段设
Xiang-Yu Dabashan tunnel rampant 5333.7 meters long, lining with injection molding of concrete and shotcrete two types, using reinforced concrete support block central gutter-type track bed. The tunnel was completed by the end of 1972 and was delivered in June 1978. Due to the seriousness of the overall roadbed, endangering traffic safety, speed 40 kilometers per hour operation; and the water is also quite serious. To this end, the Bureau of Science and Technology of the Ministry of Railways and the Capital Construction Bureau, from May 26, 1980 to June 11, 1980, participated in the on-site investigation of the Dabashan tunnel disease with the participation of relevant agencies in the road and put forward suggestions on remediation and research topics as follows: Drainage system renovation plus long ditch, its depth should ensure that the highest water level below 20 cm below the substrate. Road bed disease or seepage in serious sections