河南省板桥水库的改善加固工程,由於設計文件不能及時编出,又加工期紧迫,所以在设計文件与正式預算尚未送请領導机關審批前,为了能抓緊時間進行準备工作,預先提出一份施工前的準备工作预算,要求領導机關先予批准。这样作本來是可以理解的,甚至也是必要的。但是令人奇怪的是在这項所謂施工前的「準备工作预算」中,却罗列了一大堆这样的項目。如:收音机8架、钢絲床50張、手錶3隻,大座鐘3
As for the improvement and reinforcement project of Banqiao Reservoir in Henan Province, since the design documents can not be compiled in time and the processing period is urgent, before the design documents and the official budget have not been sent to the leading organs for examination and approval, in order to seize the preparatory work for time, A preparatory work before the budget, requiring the leadership to be approved. This is understandable and even necessary. However, it is surprising that a large number of such projects have been listed in this “preparatory work budget” before the so-called construction. Such as: 8 radio, wire bed 50, 3 watches, large clock 3