冷却塔是大型钢筋混凝土结构 ,钢筋排布对混凝土结构的质量影响很大。邯峰电厂 1号机冷却塔施工中 ,采用传统的钢筋排布设计 ,存在着钢筋左右倾斜和竖向钢筋接头率超标等问题 ,影响混凝土结构强度。在 2号机的冷却塔施工中 ,对钢筋排布尝试新的设计。经施工后证明 ,新设计完全解决了 1号机冷却塔施工中存在的问题 ,使内在质量有所提高。
The cooling tower is a large-scale reinforced concrete structure, which has a great influence on the quality of the concrete structure. Hanfeng Power Plant No. 1 cooling tower construction, the use of traditional arrangement of steel arrangement, there is the left and right tilt and vertical reinforcement joint rate exceeds the standard, the impact of concrete strength. In the construction of Unit 2 cooling tower, try the new design of the reinforcement arrangement. After construction, it proves that the new design completely solves the problems existing in the construction of No.1 cooling tower and improves the intrinsic quality.