论文部分内容阅读
为了学习和了解发达国家近十年来燃煤工业锻炉的节能及排放控制的状况与技术,以利于针对中国工业锅炉温室气体排放控制问题的讨论和解决方案的选择,在世界银行的支持和帮助下,我们中国专家组一行六人于1993年4月23日至5月16日赴美国和英国与外国专家一起进行了考察访问和工作,历时24天。 1.考察组成员考察组成员如下: 黄学成机械部第二设计院陈国岩机械部上海工业锅炉研究所谭美健机械部北京电工综合技术经济研究所
In order to learn and understand the energy saving and emission control status and technology of coal-fired industrial forgery furnaces in developed countries in recent ten years so as to facilitate the discussion and solution options for the control of greenhouse gas emissions from industrial boilers in China, the World Bank’s support and assistance We visited China and the United Kingdom with foreign experts from April 23 to May 16, 1993 for a study tour and work lasting 24 days. 1. The study group members The study group members are as follows: Huang Xuecheng Department of Mechanical Design Institute of the second Chen Guoyan Department of Mechanical Shanghai Industrial Boiler Institute Tan Meijian Department of Electrical Beijing Institute of Technology