我厂一台SHL6.5—25—AⅣ型锅炉子1986年4月投入运行,原配套卧式旋风除尘器除尘效果差,经常烟尘散落四周,影响环境,浪费能源。运行近二年,筒体多处发生穿孔,停车修补,影响生产。88年初我厂自行设计花岗岩水膜除尘器,投资1.25万元,88年6月初投入运行以来,除尘效果很好,完全达到锅炉烟囱排放标准,林格曼黑度级为1级以下,每日多回收除尘灰1吨,将除尘灰卖给砖瓦厂每年回收费用六千余元。本文介绍了花岗岩水膜除尘器的设计计算、加工及安装方法,供采用时参考。
I plant a SHL6.5-25-A Ⅳ-type boiler put into operation in April 1986, the original supporting horizontal cyclone dust removal effect is poor, often scattered around dust, affecting the environment, a waste of energy. Running for nearly two years, many holes perforation, parking repair, affecting production. At the beginning of 88, our factory designed the granite water film duster by ourselves, with an investment of 12,500 yuan. Since it was put into operation in early June, 88, the dust removing effect is very good and the discharge standard of the boiler chimney is fully met. The Ringelmann black level is below level 1, More than 1 ton of dust recovery ash, dust will be sold to brick and tile factory annual cost of recycling more than 6,000 yuan. This article describes the granite water film design, calculation, processing and installation methods for reference when used.