论文部分内容阅读
高层建筑物因结构抗震的需要和采用补偿基础的设计思想,设计中几乎都把基础埋置到一定的深度,并充分利用地下部分开辟成商场或车库,以求获得更大的经济效益。故当前深基础施工中基坑支护技术,已成为上海建筑施工企业和建设系统极为关心的新课题。 上海华侨大厦位于延安西路、乌鲁木齐北路口,总建筑面积约2.44万m~2、地下2层,基坑开挖深度
Due to the structural anti-seismic needs of the high-rise buildings and the design philosophy of adopting the compensation basis, almost all of the designs are embedded in the foundation to a certain depth, and the underground part is fully utilized to open up into shopping malls or garages in order to obtain greater economic benefits. Therefore, the foundation pit support technology in the current deep foundation construction has become a new topic that is of great concern to Shanghai construction companies and construction systems. Shanghai Overseas Chinese Tower is located at West Yan’an Road and North Urumqi Road. It has a total construction area of 24,400m2, 2 underground floors, and excavation depth.