论文部分内容阅读
淮北电厂是矿口电厂,位于煤城相山。全厂容量为35万千瓦,分一,二期建成。一期工程为两台220吨/时高压锅炉,单元配套2台5万千瓦机组(本厂编号分别为~#1、~#2),二期工程装设2台400吨/时超高压中间再热,410型三化燃煤炉,单元配套2台12.5万千瓦机组,(本厂编号为~#3、~#4)。锅炉厂房系全露天布置,燃烧系统除~#1炉为风扇磨直吹外,其余均为钢球磨中间储仓热风送粉,四角切圆摆动直流燃烧器,一次风集中布置、二次风分级送入的多级燃烧。尾部
Huaibei Power Plant is a mine power plant, located in the coal-phase Xiangshan. The whole plant capacity of 350,000 kilowatts, divided into one, two completed. The first phase of the project is two 220 tonne / hour high pressure boilers and the unit is equipped with 2 sets of 50,000 kilowatts units (our plant numbers are # 1 and # 2, respectively) and the second phase is equipped with 2 sets of 400 tonne / hour EHV intermediate Reheat, 410 type three coal-fired furnace, unit supporting 2 sets of 125,000 kilowatts, (factory number ~ # 3, ~ # 4). The boiler plant is all open-air layout. In addition to ~ # 1 furnace, the combustion system is directly fan-blown. The rest are steel ball mill intermediate hot-storage powder feeding, quad-tangential circular oscillating DC burners, primary air distribution and secondary air classification Multi-level combustion into the. Tail