论文部分内容阅读
仙台铁路管理局作为1980~1981年的技术课题,研制了自动空转装置,并正在进行装车试验。本文对此作概略的介绍。
As a technical project from 1980 to 1981, the Sendai Railway Administration has developed an automatic idler device and is carrying out loading tests. This article gives a rough introduction.