论文部分内容阅读
根据中国统配煤矿总公司和国家能源投资公司(89)中煤总基字第145号文《关于实行工程勘察报告的通知》,总公司于2月20~27日在北京组织了各院高级工程师对五部工程地质初步勘察报告进行了审查,它们是:(1)选煤院的淮北祁南选煤厂工业场地;(2)选煤院的淮南新庄孜选煤厂工业场地;(3)兖州院的淮北祁南矿工业场地;(4)兖州院的淮北祁南矿居住区;(5)北京院的韩城象山矿灰窑沟工业场地。 审查开始先由工程负责人按通知规定的内容进行全面介绍,包括报告书中一些没有详细阐述的分析、论证过程;主要设计计算参数的取值方法,和勘探、测试的具体操作,为了说明问题各院都做了一些辅助图
According to the Notice of China General Coal Mine Corporation and State Energy Investment Corporation (89), Coal General Text No. 145, “On the Implementation of Engineering Investigation Report,” the head office organized a conference in Beijing on February 20-27, The engineers conducted a review of five preliminary engineering geological survey reports: (1) the industrial site of the Qinan Coal Preparation Plant in Huaibei Coal Preparation Plant; (2) the industrial site of the Xinzhuangzi Coal Preparation Plant in Huainan Coal Preparation Plant; (3) ) Yanzhou Institute of Huaibei Qinan mine industrial site; (4) Yanzhou Institute of Huaibei Qinan mine residential area; (5) Beijing Institute of Xiangcheng Xiangshan Yao Yaoyao industrial site. The review begins with a comprehensive introduction by the project manager in accordance with the provisions of the notification, including the analysis and verification process not elaborated in the report, the method of value calculation of the main design calculation parameters, and the specific operations of exploration and testing. In order to illustrate the problem Each hospital has done some auxiliary map