论文部分内容阅读
本文介绍一种曾在襄渝线胡家沟预应力混凝土桥高桥墩加固工作中使用的升降工作平台,用以代替传统的脚手架施工,取得了较好的经济效益。
This paper introduces a lifting work platform which was used in the work of strengthening the high bridge pier of Hujiagou Prestressed Concrete Bridge in Xiang-Yu Line to replace the traditional scaffolding construction and achieved good economic benefits.