山西省的大中型泵站到1986年底,已基本建成投产并经“三查三定”确认的有67处,其中,大型站5处,大泵站4处,机灌站4处,水轮泵站3处.总装机14万千瓦;主要分布在黄河、汾河、桑干河和部分水库周围;加权平均扬程105米;设计流量102秒立米;有效面积218万亩.这67处泵站中,50年代建成的5处;60年代建成的31处;70年代建成的29处;80年代建成的2处.
At the end of 1986, the large and medium-sized pumping stations in Shanxi Province have basically completed operation and confirmed that there are 67 large and medium-sized pumping stations, of which 5 are large stations, 4 are large pumping stations, 4 are filling stations, Water pump station 3. The total installed capacity of 140,000 kilowatts; mainly distributed in the Yellow River, Fen River, Sanggan River and some reservoirs around; weighted average lift of 105 meters; design flow rate of 102 seconds; effective area of 218 mu. At the station, there were 5 built in the 1950s, 31 built in the 1960s, 29 completed in the 1970s and 2 completed in the 1980s.