临河至策克规划铁路沿途经过著名的巴丹吉林、乌兰布和两大沙漠。在沙漠地区修建铁路,一方面沙漠地区的自然条件十分恶劣,同时又有一些有利因素,如地形开阔、坡度平缓、河流稀少、不占农田等。在铁路规划初步选线过程中,依据修建风沙地区铁路工程的实践经验,以及风沙地区铁路选线设计原则,绕避对铁路危害较大的戈壁风沙流、大风区风沙流及高大流动沙丘,使铁路沙害减轻到最小程度。鉴于本线建成初期的运营状况,在保证运营安全的前提下,减少初期投资,待铁路建成运营后,结合我国沙漠综合治理措施,在工程治沙防护的基础上,分步骤实施植物固沙,从根本上解决铁路沙害问题。
Linhe to Cek planning railway along the famous Badain Jilin, Ulan Buh and the two deserts. The construction of the railway in the desert area, on the one hand the natural conditions in the desert are very poor, while there are some favorable factors, such as open terrain, gentle slope, scarce rivers and no farmland. During the preliminary alignment of railway planning, according to the practical experience of railway construction in wind-blown sand areas and the design principles of railway alignment in wind-blown sand areas, the Gobi wind-blown sandstorms and wind-blown sand dunes that are more harmful to the railway should be avoided Reduce the railway sand damage to a minimum. In view of the initial operational status of this line, under the precondition of ensuring operational safety, reduce initial investment. After the railway is completed and put into operation, combined with comprehensive desertification control measures in our country, plant sand fixation shall be implemented step by step on the basis of project sand control protection. Fundamentally solve the problem of railway sand hazard.