大牛地气田冬季平均气温低,最低达到-30℃以下,气井生产受气温影响大,随着气温的降低管线堵塞频繁发生,严重影响到气井的正常生产~([1])。尤其是近年来频繁出现的注醇管线堵塞情况,导致堵塞井无法通过站内注醇泵泵注甲醇、泡排剂等各类药剂,被动的采取井口排水及预防措施,大幅增加了人员日常工作量。目前大牛地气田出现的注醇管线堵塞井,多为各种药剂通过站内注醇泵混注后经过注醇管线在管内结垢所致,解堵困难。常用的解堵方法有注醇解堵和降压解堵。
The average winter temperature in Daniudi gas field is low, and the lowest reaches below -30 ℃. The production of gas wells is greatly affected by the temperature. Blockage of gas lines frequently occurs as the temperature decreases, which seriously affects the normal production of gas wells. [1] Especially in recent years, frequent injection of alcohol pipeline plugging situation, leading to blocked wells can not be injected through the station alcohol injection pump methanol, foam agents and other drugs, passive take wellhead drainage and preventive measures, a substantial increase in personnel daily workload . Currently Daniudi gas injection pipeline blockage wells appear, mostly for all kinds of pharmaceutical injection through the station after injection alcohol injection pipe line through the pipe scale scaling, plugging difficulties. Commonly used methods of plugging alcohol injection plugging and decompression plugging.