小龙潭煤矿地处滇南山区盆地之中,煤层厚、储量大,褐煤上部覆盖物为第四系表土和泥灰岩.布沼坝露天三期扩建规模240万t/a,剥离重心与排土场重心最大高差约600m,年剥离量为290万m~3左右.原使用的单斗电铲剥离——绞车提升——小火车运输的排弃方法已不能满足生产要求.担负工艺设计的沈阳院和云南院采用了中型斗轮机采掘、胶带输送机运输及排土机排弃的连续生产工艺.为这连续开采工艺服务的大型成套设备在国内是首次研制.这套大型设备按原机械部和煤炭部批准的“工业性试验大纲”
Xiaolongtan Mine is located in the mountainous basin of southern Yunnan, with thick coal seam and large reserves, covering the upper part of the lignite with Quaternary topsoil and marl. The maximum height difference of the field center of gravity is about 600m, the annual peel amount is about 2.9 million m ~ 3. The original single-bucket electric shovel stripping - winch upgrade - the train train abandonment method has been unable to meet the production requirements. Shenyang Institute and Yunnan Institute of the use of a medium bucket wheel excavation, conveyor belt conveyor and dumping continuous production technology for the continuous mining process of large complete sets of equipment in the country for the first time the development of this large-scale equipment according to the original machinery Department and the Ministry of Coal approved “industrial test program”