一、电站基本情况新安江电站始建于1957年,1960年建成发电。它是以发电为主,兼以防洪、航运等综合效益的电站。新安江电站是华东地区最大的水电站,在全国水电站中占第6位。总装机容量66.25万千瓦,由9台每台为7万5千千瓦的发电机组组成,设计保证出力为17.8万千瓦,年平均发电量14亿度。设计发电水头72米,实际上为60多米。电站所形成的水库是一个多年调节水库,水库正常高水位达108米时,库容为178.4亿米~3,由此形成的水库面积为580平方公里,成了一个大型的人工湖
First, the basic situation of power plant Xin’anjiang Power Station was built in 1957, built in 1960 to generate electricity. It is based on power generation, both flood control, shipping and other comprehensive benefits of power plants. Xin’anjiang Power Station is the largest hydropower station in East China and occupies the 6th among the national hydropower stations. The total installed capacity of 662,500 kilowatts, from nine units each for the 75,000 kilowatts of generating units, designed to ensure that the output of 178,000 kilowatts, the average annual generating capacity of 1.4 billion degrees. Design power head 72 meters, in fact, more than 60 meters. The reservoir formed by the power station is a multi-year regulation reservoir. When the normal high water level of the reservoir reaches 108 meters, the storage capacity is 17.84 billion meters. The resulting reservoir area is 580 square kilometers and becomes a large artificial lake