论文部分内容阅读
本文在全面分析某金矿矿体賦存和复杂开采技术条件的基础上,对其采矿方法的合理选择问题进行了富有价值的探讨和比较,指出采用全尾矿高水速凝固化胶结充填工艺和以垂直分条充填采矿法为主的开采方案的合理性和必要性。
Based on a comprehensive analysis of the occurrence and complicated mining conditions of a gold ore body, the article discussed and compared the reasonable selection of mining methods, and pointed out that using the full tailing high water-setting cementation filling process And the rationality and necessity of the mining scheme based on vertical strip filling of mining law.