在分析凤滩水电站扩机必要性的基础上,重点讨论了凤滩水电站扩机后所带来的调峰效益,最后的结论是凤滩水电站扩机既必要,又可获得显著的调峰效益,建议尽快建设。
On the basis of analyzing the necessity of the expansion of Fengtan Hydropower Station, the emphasis is put on the peak regulation benefits brought by the expansion of Fengtan Hydropower Station. The final conclusion is that the expansion of Fengtan Hydropower Station is both necessary and significant peak shaving benefit It is recommended to build as soon as possible.