论文部分内容阅读
为了实现2015年“无电地区人口全部用上电”的目标,国家电网公司确立了“以大电网延伸供电为主,分散电源就地供电为辅”的原则,制定了全面解决无电问题的方案,计划投资243.8亿元(含川藏联网工程),通过电网最大限度延伸,解决42.7万无电户、174.9万无电人口的通电问题。为确保“十二五”全部无电人口用上电,国家电网
In order to achieve the goal of “powering up all the population in the areas without electricity” in 2015, the State Grid Corporation of China established the principle of “extending power supply mainly by large power grids and supplementing local power supply by decentralized power sources” and formulated a comprehensive solution No electricity problem program, plans to invest 24.38 billion yuan (including Sichuan Tibet network project), through the power grid to maximize the extension to address the 427,000 households without electricity, 174.9 million people without electricity power problems. In order to ensure “” five "all electricity-free population with electricity, the national grid