一、概述 鲁布革水电站位于云南省罗平县境内黄泥河下游,是一座混合式地下电站。厂区地下建筑物的规模较大,主、副厂房开挖尺寸的长×宽×高为125.0米×18.0米×38.4米。 鲁布革水电站的发电机是由西德西门子公司提供的,水轮机由挪威克瓦纳工厂制造。主要的设计参数由设计方面与厂家共同确定。但是,为了满足设备尺寸及安装检修
I. Overview Lubuge Hydropower Station is located in Luoping County, Yunnan Province, the lower Yellow River, is a hybrid underground power station. The underground buildings in the plant area are larger in size. The length, width and height of excavation of the main and auxiliary workshops are 125.0mx18.0mx38.4m. The generator for the Lubuge hydroelectric plant is supplied by Siemens West Germany and the turbine is manufactured at the Kvarner plant in Norway. The main design parameters are determined by the design and manufacturers. However, in order to meet the equipment size and installation and maintenance