摘要:在我国经济发展步伐不断加快,城市化水平不断提升的时代背景下,建筑工程行业又迎来了新一轮的发展高峰期,其中高层建筑工程作为这个时代发展的主流趋势越来越成为现代建筑工程施工设计的首选项目模式。而深基坑支护施工技术作为高层建筑的重要施工环节,其施工出书成熟与否以及其施工质量的好坏将直接关系到整体建筑工程的后期施工以及日后的交付使用安全,因此强化高层建筑深基坑支护施工的技术及质量控制是建筑工程行业发展的必然要求。本文将结合作者多年的工作实践经验以高层建筑深基坑支护施工技术及其质量控制为重点,进行全文性的论述,以供参考。
关键词:高层建筑;深基坑支护;质量
Abstract: The accelerating pace of economic development in China under the background of urbanization ever-increasing level, the construction industry ushered in a new round of development peak, which high-rise building has increasingly become the main trend which was the era mode choice for the design of modern building construction projects. This paper will combine the year’s experience of work practice in high-rise building deep foundation construction technology and quality control support for the focus, the full text of the discourse, for reference.Key words: high-rise buildings; deep foundation pit; quality
中图分类号:TU74文献标识码: A 文章编号:2095-2104(2012)05-0020-02
一、高层建筑深基坑支护的主要形式和技术要求
(一)深基坑支护的主要形式
1.混凝土挡土墙与基底加固相结合的支护。该种形式因其技术含量较低,便于进行施工操作且成本较低等优势为建筑企业所青睐。但随着近几年对高层建筑工程要求的逐年提高,其施工工期长、环境影响较大、基层加固质量难控性高等不足之处也逐步暴露出来。
2.土钉墙支护。该种支护形式以钢结构为主干,结合混凝土面层形成较为坚固的混合土体,其以造价低廉、施工便捷和工艺简单等优点被广泛应用于深基坑支護工程中。
3.复合土钉墙支护。主要是由混凝土搅拌桩等超前支护组成的防渗帷幕,能够有效地解决喷射面与土体的粘结问题,并且具有较好的隔水性。基坑深度一般为 5~10m,比较适合在距离周围建筑物较远且对变形要求较高的基坑中使用。其优点是工期短、成本低、施工工艺简单。
4.喷锚网支护。是一种比较先进的支护形式,比较适合在土质条件较差的地方使用,具有施工灵活、设备简单、支护费用低、对基坑附近建筑物影响程度小等优点。
(二)深基坑支护的技术要求
高层建筑深基坑支护的主要作用是在基坑开挖过程中用以挡土和挡水,并以此来确保基坑开挖施工能够顺利进行,防止由于基坑坍塌对周边建筑、地下管线等造成危害。在高层建筑的支护结构当中一小部分是临时性的,大部分基本都是永久性埋于地下,如地下连续墙等。因此,支护结构不仅应能够确保基础安全,同时还要便于施工、经济合理。高层建筑深基坑支护的基本要求如下:其一,应采用技术先进、结构简单、可靠性高的施工技术,同时还要确保支护体系能起到挡土的作用,以保持基坑边坡的稳定;其二,应确保基坑周围建筑、道路以及地下管线等的安全;其三,基础施工应在地下水位以上进行;其四,经济上应合理,并注意环保和施工安全。
二、高层建筑深基坑支护的施工技术
在高层建筑的深基坑支护中,具体的施工流程一般包括以下几个步骤:
(一)施工前期的准备工作
在进行支护施工之前,需认真对施工现场的标高以及基坑开挖深度进行复核,并对基坑周边的建筑物类型、道路和地下管线等的详细资料进行调查,施工过程中一旦出现与勘查报告及设计要求不符的情况时,必须立即通知相关设计单位进行调整。
(二)支护桩施工
支护桩的施工是整个支护过程中较为重要环节,成桩的质量优劣直接影响整个支护结构的质量,因此,必须对施工过程的主要工序进行严格控制,如成孔、清孔、制作及安放钢筋笼、混凝土的配合比等。
(三)锚杆施工
锚杆是一种较为新型的成拉杆件,其一端与挡土墙进行可靠联结,另一端则锚固于地基的岩石中,主要是利用锚杆与岩石之间的锚固力来承受各种向外的倾覆力。当基坑开挖至锚杆的标高之后,应先进行土层锚杆施工,具体步骤为:钻孔、制作锚头、穿锚索、注浆,浆液通常采用水泥砂浆,注浆结束后,开始安装钢腰梁、台座、垫板、穿外锚具、最后进行张拉锚固,并在现场进行试验,确定锚杆符合设计要求后方可结束。
(四)土方开挖
在基坑土方开挖过程中,一般挖土量都会比较大,尘土会使周围的居民受到一定的影响,所以在开挖过程中,应采用分层开挖的方式进行,这样就可以一边挖一边运,避免了大量的土方堆积。土方开挖的速度应根据对围护结构监测结构的变化而变化,一旦结构发生位移、沉降等异常现象时,需立即停止,并及时查明原因,采取相应的措施进行处理。
三、高层建筑深基坑支护施工的质量控制要点
高层建筑深基坑支护的施工阶段是整个工程中较为关键的阶段,因此,必须对该阶段的质量进行严格控制。
(一)深基坑施工
在高层建筑深基坑工程中,包括许多重要环节,如挖土、防水、挡土及维护等,是一项较为复杂的系统工程,一旦其中任何一个环节出现失误,都将会对整个工程造成影响,严重时还会发生安全事故。因此,施工单位必须严格按照施工流程和有关的技术规范等组织施工,并对重要位置的施工制定详细可行的施工方案,同时还应加强过程控制。例如,在确定土方开挖方案时,需对基坑的地质报告、地下设施以及周边建筑物等实际情况进行详细分析,如果是特殊土体则应精心组织施工,对于软土地区而言,基坑的开挖深度不宜过大;膨胀土地区尽量不要在雨季进行开挖。
(二)深基坑周围土体止水效果的控制
由于地下水对深基坑工程的施工影响较大,因此,在地下水位较高的地区进行深基坑施工,必须制定详细的止水方案。在制定具体的止水方案时,应从防、降、排这三个方面加以考虑,并根据地勘部门提供的详细地质资料,分析地下水的主要成因,同时还应对基坑周围的环境进行深入了解,绝对不能仅靠不间断的抽水来降低水位,不然很有可能造成基坑附近的土体发生流失,致使周边建筑物不均匀沉陷,严重时甚至会发生管涌,不仅增加了处理难度,而且还会延误工期。止水帷幕是深基坑支护中较为常用一种止水措施,为了确保支护工程能够顺利进行,在止水帷幕施工时需注意以下几点:1.确保桩体质量合格;2.确保桩的密实度和搭接长度符合要求,防止桩头开叉、蜂窝、空洞等现象的发生;3.严禁在支护结构上随意开口,否则不仅会使支护结构的安全受到影响,而且还破坏了止水帷幕的效果,地下水则很容易从开口位置渗入。
(三)深基坑支护的信息化管理
深基坑支护信息化管理的主要手段是安排较为专业的施工监测人员对基坑及周围环境进行实时监测,并根据监测到实际情况与预期性状进行对比分析,发现异常情况及时采取相应措施进行处理,确保工程安全。深基坑支护的具体监测内容如下:1.支护结构顶部的水平位移情况;2.支护结构及周围建筑、道路的沉降、裂缝情况;3.基坑底部隆起情况。上诉监测内容除了应每天进行一遍目测之外,还应每隔 10m 左右设置一个观测点,并在基坑开挖后,每隔 3 天左右监测一次,位移较大时可调整为 1 天 1 次。监测到的结果必须能够真实反映被测目标的动态趋势,并绘制变化曲线图。另外,在开挖较深的基坑时,需对支撑的内应力进行测试,当应力值达到设计值的 90%时,应采取必要的防范措施。
(四)突发事件的处理
在高层建筑深基坑支护施工过程中,经常会发生一些不可预见的事件,为了确保支护结构的质量,需制定应急预案。常见的突发事件如下:1.基坑内流沙、管涌;2.支护结构局部出现沉降、裂缝;3.气象异常;4.相邻工地施工的影响;5.地下障碍物妨碍施工正常进行等。上诉突发事件一旦发生后,应及时启动应急预案,并组织有关单位研究解决对策。
结论:
总而言之,随着高层建筑的发展,深基坑支护的难度会越来越来。只有在施工过程中对施工质量进行严格控制,才能确保整体工程的质量。
参考文献:
[1]吴碧桥.唐兵.深圳国际商会中心超高层建筑施工技术[A].第三届中国建设工程质量论坛论文集[C].2009(11)
[2]甘尚琼.深基坑支护设计方案优选问题探讨[A].第二十届全国高层建筑结构学术交流会论文集[C].2008(06)
[3]丁伟祥.黄得建.天津滨海地区软塑地质条件下不同深基坑支护形式设计与施工探讨[A].第五届全国基坑工程学术讨论会论文集[C].2008(10)
[4]李海明.深基坑支护技术在复杂基坑中的应用[A].中国建筑学会施工学术委员会模板与脚手架专业委员会 2010 年会论文集[C].2010(08)
[5]靳永军.吴海洋.刘德成.高层建筑深基坑支护的施工质量控制[J].科技信息.2009(06)
关键词:高层建筑;深基坑支护;质量
Abstract: The accelerating pace of economic development in China under the background of urbanization ever-increasing level, the construction industry ushered in a new round of development peak, which high-rise building has increasingly become the main trend which was the era mode choice for the design of modern building construction projects. This paper will combine the year’s experience of work practice in high-rise building deep foundation construction technology and quality control support for the focus, the full text of the discourse, for reference.Key words: high-rise buildings; deep foundation pit; quality
中图分类号:TU74文献标识码: A 文章编号:2095-2104(2012)05-0020-02
一、高层建筑深基坑支护的主要形式和技术要求
(一)深基坑支护的主要形式
1.混凝土挡土墙与基底加固相结合的支护。该种形式因其技术含量较低,便于进行施工操作且成本较低等优势为建筑企业所青睐。但随着近几年对高层建筑工程要求的逐年提高,其施工工期长、环境影响较大、基层加固质量难控性高等不足之处也逐步暴露出来。
2.土钉墙支护。该种支护形式以钢结构为主干,结合混凝土面层形成较为坚固的混合土体,其以造价低廉、施工便捷和工艺简单等优点被广泛应用于深基坑支護工程中。
3.复合土钉墙支护。主要是由混凝土搅拌桩等超前支护组成的防渗帷幕,能够有效地解决喷射面与土体的粘结问题,并且具有较好的隔水性。基坑深度一般为 5~10m,比较适合在距离周围建筑物较远且对变形要求较高的基坑中使用。其优点是工期短、成本低、施工工艺简单。
4.喷锚网支护。是一种比较先进的支护形式,比较适合在土质条件较差的地方使用,具有施工灵活、设备简单、支护费用低、对基坑附近建筑物影响程度小等优点。
(二)深基坑支护的技术要求
高层建筑深基坑支护的主要作用是在基坑开挖过程中用以挡土和挡水,并以此来确保基坑开挖施工能够顺利进行,防止由于基坑坍塌对周边建筑、地下管线等造成危害。在高层建筑的支护结构当中一小部分是临时性的,大部分基本都是永久性埋于地下,如地下连续墙等。因此,支护结构不仅应能够确保基础安全,同时还要便于施工、经济合理。高层建筑深基坑支护的基本要求如下:其一,应采用技术先进、结构简单、可靠性高的施工技术,同时还要确保支护体系能起到挡土的作用,以保持基坑边坡的稳定;其二,应确保基坑周围建筑、道路以及地下管线等的安全;其三,基础施工应在地下水位以上进行;其四,经济上应合理,并注意环保和施工安全。
二、高层建筑深基坑支护的施工技术
在高层建筑的深基坑支护中,具体的施工流程一般包括以下几个步骤:
(一)施工前期的准备工作
在进行支护施工之前,需认真对施工现场的标高以及基坑开挖深度进行复核,并对基坑周边的建筑物类型、道路和地下管线等的详细资料进行调查,施工过程中一旦出现与勘查报告及设计要求不符的情况时,必须立即通知相关设计单位进行调整。
(二)支护桩施工
支护桩的施工是整个支护过程中较为重要环节,成桩的质量优劣直接影响整个支护结构的质量,因此,必须对施工过程的主要工序进行严格控制,如成孔、清孔、制作及安放钢筋笼、混凝土的配合比等。
(三)锚杆施工
锚杆是一种较为新型的成拉杆件,其一端与挡土墙进行可靠联结,另一端则锚固于地基的岩石中,主要是利用锚杆与岩石之间的锚固力来承受各种向外的倾覆力。当基坑开挖至锚杆的标高之后,应先进行土层锚杆施工,具体步骤为:钻孔、制作锚头、穿锚索、注浆,浆液通常采用水泥砂浆,注浆结束后,开始安装钢腰梁、台座、垫板、穿外锚具、最后进行张拉锚固,并在现场进行试验,确定锚杆符合设计要求后方可结束。
(四)土方开挖
在基坑土方开挖过程中,一般挖土量都会比较大,尘土会使周围的居民受到一定的影响,所以在开挖过程中,应采用分层开挖的方式进行,这样就可以一边挖一边运,避免了大量的土方堆积。土方开挖的速度应根据对围护结构监测结构的变化而变化,一旦结构发生位移、沉降等异常现象时,需立即停止,并及时查明原因,采取相应的措施进行处理。
三、高层建筑深基坑支护施工的质量控制要点
高层建筑深基坑支护的施工阶段是整个工程中较为关键的阶段,因此,必须对该阶段的质量进行严格控制。
(一)深基坑施工
在高层建筑深基坑工程中,包括许多重要环节,如挖土、防水、挡土及维护等,是一项较为复杂的系统工程,一旦其中任何一个环节出现失误,都将会对整个工程造成影响,严重时还会发生安全事故。因此,施工单位必须严格按照施工流程和有关的技术规范等组织施工,并对重要位置的施工制定详细可行的施工方案,同时还应加强过程控制。例如,在确定土方开挖方案时,需对基坑的地质报告、地下设施以及周边建筑物等实际情况进行详细分析,如果是特殊土体则应精心组织施工,对于软土地区而言,基坑的开挖深度不宜过大;膨胀土地区尽量不要在雨季进行开挖。
(二)深基坑周围土体止水效果的控制
由于地下水对深基坑工程的施工影响较大,因此,在地下水位较高的地区进行深基坑施工,必须制定详细的止水方案。在制定具体的止水方案时,应从防、降、排这三个方面加以考虑,并根据地勘部门提供的详细地质资料,分析地下水的主要成因,同时还应对基坑周围的环境进行深入了解,绝对不能仅靠不间断的抽水来降低水位,不然很有可能造成基坑附近的土体发生流失,致使周边建筑物不均匀沉陷,严重时甚至会发生管涌,不仅增加了处理难度,而且还会延误工期。止水帷幕是深基坑支护中较为常用一种止水措施,为了确保支护工程能够顺利进行,在止水帷幕施工时需注意以下几点:1.确保桩体质量合格;2.确保桩的密实度和搭接长度符合要求,防止桩头开叉、蜂窝、空洞等现象的发生;3.严禁在支护结构上随意开口,否则不仅会使支护结构的安全受到影响,而且还破坏了止水帷幕的效果,地下水则很容易从开口位置渗入。
(三)深基坑支护的信息化管理
深基坑支护信息化管理的主要手段是安排较为专业的施工监测人员对基坑及周围环境进行实时监测,并根据监测到实际情况与预期性状进行对比分析,发现异常情况及时采取相应措施进行处理,确保工程安全。深基坑支护的具体监测内容如下:1.支护结构顶部的水平位移情况;2.支护结构及周围建筑、道路的沉降、裂缝情况;3.基坑底部隆起情况。上诉监测内容除了应每天进行一遍目测之外,还应每隔 10m 左右设置一个观测点,并在基坑开挖后,每隔 3 天左右监测一次,位移较大时可调整为 1 天 1 次。监测到的结果必须能够真实反映被测目标的动态趋势,并绘制变化曲线图。另外,在开挖较深的基坑时,需对支撑的内应力进行测试,当应力值达到设计值的 90%时,应采取必要的防范措施。
(四)突发事件的处理
在高层建筑深基坑支护施工过程中,经常会发生一些不可预见的事件,为了确保支护结构的质量,需制定应急预案。常见的突发事件如下:1.基坑内流沙、管涌;2.支护结构局部出现沉降、裂缝;3.气象异常;4.相邻工地施工的影响;5.地下障碍物妨碍施工正常进行等。上诉突发事件一旦发生后,应及时启动应急预案,并组织有关单位研究解决对策。
结论:
总而言之,随着高层建筑的发展,深基坑支护的难度会越来越来。只有在施工过程中对施工质量进行严格控制,才能确保整体工程的质量。
参考文献:
[1]吴碧桥.唐兵.深圳国际商会中心超高层建筑施工技术[A].第三届中国建设工程质量论坛论文集[C].2009(11)
[2]甘尚琼.深基坑支护设计方案优选问题探讨[A].第二十届全国高层建筑结构学术交流会论文集[C].2008(06)
[3]丁伟祥.黄得建.天津滨海地区软塑地质条件下不同深基坑支护形式设计与施工探讨[A].第五届全国基坑工程学术讨论会论文集[C].2008(10)
[4]李海明.深基坑支护技术在复杂基坑中的应用[A].中国建筑学会施工学术委员会模板与脚手架专业委员会 2010 年会论文集[C].2010(08)
[5]靳永军.吴海洋.刘德成.高层建筑深基坑支护的施工质量控制[J].科技信息.2009(06)