通过对邯钢西区炼铁厂3200m~3高炉的热风炉煤气、空气双预热系统在应用中存在的问题及原因进行分析,采取相应的措施进行改造,取得了明显的效果,满足了生产的要求。
Through the analysis of the problems existing in the application of double air preheating system for blast furnace and the reason for the blast furnace 3200m ~ 3 blast furnace in Handan Iron and Steel Western District Iron and Steel Co., Ltd., taking appropriate measures to carry out the transformation and achieved significant results to meet the production Claim.