论文部分内容阅读
1992年10月,我从学校毕业分配到巴陵石化岳化橡胶厂聚合车间上班,不久就赶上了装置年度停车大检修。 当时,我所在的溶剂回收工段的脱水塔有30多米高。那一次,由于设备长周期运转,溶剂油中夹带的胶液在塔壁上结成厚厚的一层胶。此次检修,我们班承担了为脱水塔清胶的任务。记得那是一个雨后的清晨,我身穿雨衣头戴安全帽,拿着工具在初冬的冷风中爬到离地面10米多高的塔上。我的师傅——已在本岗位上班多年的班长也上了塔,给我们几位班员讲完检修操作要领后,班长对我说:
In October 1992, I graduated from school assigned to Baling Petrochemical Yue rubber plant polymerization workshop to work, and soon to catch up with the annual parking device overhaul. At that time, I was in the solvent recovery section of the dehydration tower more than 30 meters high. That time, due to the long period of operation of the equipment, the glue entrained in the solvent oil forms a thick layer of glue on the tower wall. The maintenance, our class took the task of dehydration tower cleaning plastic. I remember it was a rainy morning, I wore a raincoat wearing a helmet, with tools in the early winter cold climb to the tower 10 meters above the ground from the ground. My master - has been working in this position for many years the squad also on the tower, to give us a few class members finished inspection essentials, the squad leader said to me: