论文部分内容阅读
For its complexity, engineering construction schedule design is limited by various factors.Simulation-based engineering construction schedule takes critical path method (CPM) network as frame and calls complex cyclic operation network (CYCLONE) simulation model enclosed in advance for its simulation nodes. CYCLONE simulation model takes charge of simulating stochastic duration of activity and efficiency of resources, while CPM model performs project scheduling. This combination avoids the shortcomings of both models. Furthermore, geographic information system (GIS) technique is utilized to visualize the construction processes which are otherwise difficult to be understood by static results described. Application in practical project verifies the feasibility and advantage of the technique.