论文部分内容阅读
本文结合规范要求,针对施工各阶段质量问题,提出具体质量管理和控制要点,充分发挥建设、施工、监理等各方责任主体在质量管理的主动性,使之在工程建设的各个阶段,各尽其责。通过以开工前质量预控、施工阶段施工质量控制、安装阶段材料质量控制为重点的质量控制方法,做到质量问题事前预控,提高建筑电气专业的施工质量。
In this paper, the standard requirements, in view of the quality of the various stages of construction, put forward specific quality management and control points, give full play to the construction, construction, supervision and other responsible parties in the quality management initiative, so that in all stages of construction, Its responsibility. Through pre-start quality control, construction quality control during the construction phase, the material quality control during the installation phase as the focus of quality control methods, so that quality problems can be controlled in advance to improve the construction quality of construction electrical engineering.